My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2013-09-16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
09/16/2013
>
FULL PACKET_2013-09-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 4:18:37 PM
Creation date
9/12/2013 6:53:51 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
9/16/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
992
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Environmental Checklist <br />through the routine transport, use, or disposal of hazardous waste during operation of the proposed <br />project. Impacts would be less than significant with implementation of Mitigation Measure HAZ -1. <br />Mitigation Measure HAZ -1. Prior to receipt of a demolition permit, the applicant will submit proof <br />to the City's Planning and Building Division showing that a certified asbestos and lead inspector has <br />conducted a survey and testing of the existing structures on the project site to identify any asbestos - <br />or lead- containing materials. If identified, the applicant will submit proof that lead -based paint <br />materials and asbestos - containing materials have been removed according to proper abatement <br />procedures. All abatement activities will be in compliance with California Division of Occupational <br />Safety and Health, federal Occupational Safety and Health Administration, and SCAQMD <br />requirements. Only trained and certified lead and asbestos abatement personnel will be allowed to <br />perform abatement activities. All lead and asbestos - containing materials removed from the project <br />site will be hauled to a licensed receiving facility and disposed of under proper manifest, if needed, <br />by a transportation company certified to handle lead and asbestos- containing materials. Following <br />completion of the lead and asbestos abatement, a report documenting the abatement procedures <br />used, the volume of asbestos - containing materials removed, and where the material was moved to <br />will be provided to the City. The report will also include transportation and disposal manifests of- <br />dump tickets. <br />b. Create a significant hazard to the public or the environment through reasonably foreseeable <br />upset and accident conditions Involving the release of hazardous materials into the <br />environment? <br />Less- than - Significant Impact with Mitigation Incorporated. As discussed in Vlll.a, the existing <br />structures on the project site were developed during the time when asbestos and lead were common <br />in general building materials. As a result and to reduce potential impacts on asbestos and lead <br />containing materials to a less- than - significant level, Mitigation Measure HAZ -1 has been <br />incorporated which requires the site structures to be surveyed for asbestos and lead containing <br />materials and requires removal of any identified hazardous material prior to demolition. <br />Project construction activities would involve a limited use of hazardous materials. Equipment that <br />would be used in construction of the proposed project has the potential to release oils, greases, <br />solvents, and other finishing materials through accidental spills. However, the consequences of <br />construction- related spills are not substantial because the volume of hazardous materials held <br />within any single piece of construction equipment is limited. Construction - related spills of <br />hazardous materials are not uncommon, but the enforcement of construction and demolition <br />standards, including BMPs by appropriate local and state agencies, would minimize the potential for <br />an accidental release of petroleum products and /or hazardous materials or explosions during <br />construction. Federal, state, and local regulations would be followed by the construction contractor <br />to reduce the effects of potential hazardous materials spills. <br />Operation of the proposed project would also use and store a limited amount of hazardous materials <br />including solvents, cleaning agents, paints, and pesticides. Large volumes of these hazardous <br />materials would not be stored on site. Any spill or release of the hazardous materials stored or <br />routinely used in operation of the project is not anticipated to have the volume to result in a <br />significant hazard to residents or workers in the vicinity of the project. Further, because the project <br />would comply with federal, state, and local hazardous waste regulations and implement Mitigation <br />Measure HAZ -1, the proposed project would not create a significant hazard to the public or the <br />The Bat Nha Buddhist Meditation Center 3-47 June 2013 <br />Initial Study /Mltigated Negative Declaration ICF 00215.12 <br />31 C -100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.