Laserfiche WebLink
City of Santa Ana Environmental Checklist <br />Table 3 -11. Project Consistency with the Santa Ana General Plan <br />Policy- Minimize changes in <br />Consistency <br />Goal, Objective, or Policy <br />Consistency Discussion Determination <br />Circulation Element <br />proposed project. A General Construction Permit <br />Goal 7 - Utilize alternative <br />The project applicants have established a shared Consistent <br />parking strategies as a <br />parking agreement with the SAUSD that allows for <br />means of managing <br />the Bat Nha Meditation Center to utilize up to 55 <br />transportation demand. <br />parking spots at the Alhambra Lincoln Elementary <br />mitigate the projected <br />school on weekends. The proposed project would <br />increases In pollutant loads <br />be consistent with Goat 7 of the Circulation <br />and flows. <br />Element by utilizing 55 spaces at the Lincoln <br />Elementary School as an alternative parking <br />strategy to manage parking and transportation <br />Policy - Ensure that post- <br />demand. <br />Conservation Element <br />in post - development runoff from the site and the <br />Policy- Minimize changes in <br />The proposed project would be required to obtain Consistent <br />hydrology and pollutant <br />a General Construction Permit to develop the <br />loading; require <br />proposed project. A General Construction Permit <br />incorporation of control, <br />addresses soil disturbance activities greater than <br />including structural and <br />one acre and includes the development and <br />non - structural and Best <br />Implementation of SWPPP, WQMP, and BMPs to <br />Management Practices to <br />provide sediment and erosion control, waste <br />mitigate the projected <br />handling measures, and non stormwater <br />increases In pollutant loads <br />management. As such, the proposed project would <br />and flows. <br />include BMPs to mitigate the projected increases in <br />pollutant loads and flows, consistent with this <br />policy and RWQCB requirements. <br />Policy - Ensure that post- <br />The proposed project would result in an increase Consistent <br />development runoff rates <br />in post - development runoff from the site and the <br />and velocities from a site <br />City's DAMP and LIP would require <br />have no significant adverse <br />implementation of a WQMP to incorporate source - <br />impact on downstream <br />control BMPs. There are no streams or rivers <br />erosion and stream habitat. <br />within or adjacent to the project site and no <br />significant adverse impacts on downstream <br />erosion or stream habitat are anticipated. The <br />project would be consistent with this Dolicv. <br />Land Use Element <br />Goal 3 - Preserve and The proposed project would result in the Consistent <br />improve the character and redevelopment of an existing religious facility on a <br />integrity of neighborhoods. previously developed site that is within a <br />completely developed urban area and located <br />adjacent to two other existing religious facilities <br />(i.e., the New Spirit Baptist Church and the Lao <br />Evangelical Church). The proposed project would <br />result in inBll development that is consistent with <br />the objectives of the Low Residential LR -7 district <br />and the R -1 zoning district with the approval of a <br />CUP. The project is expected to improve the <br />character and integrity of the area, which is <br />consistent with this eoal. <br />The Bat Nha Buddhist Meditation Center 3 -61 <br />Initial Study /Mitigated Negative Declaration <br />31C -114 <br />ICr 00215.12 <br />