My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2013-09-16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
09/16/2013
>
FULL PACKET_2013-09-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 4:18:37 PM
Creation date
9/12/2013 6:53:51 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
9/16/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
992
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Environmental Checkllst <br />As provided above, the City's noise ordinance exempts construction activities from the noise <br />standard (providing that such activities take place between the hours of 7:00 a.m. to 8:00 p.m. on <br />weekdays and Saturdays). The construction activities of the proposed project would not exceed the <br />City's permitted construction hours. However, the short -term noise from construction would be <br />loud at times at the nearby noise- sensitive land uses, and although temporary, could be disruptive. <br />Therefore, Mitigation Measure N01 -1, which requires implementation of noise control measures, is <br />provided to reduce construction noise levels to a less -than- significant level. <br />Mitigation Measure N01 -1: To reduce construction noise generated by the proposed project, the <br />City will ensure that the contractor will implement the following measures: <br />• All mobile o• fixed noise - producing equipment used on the project that is regulated for noise <br />output by a local, state, o• federal agency will comply with such regulation while in the course of <br />project activity. <br />• Electrically powered equipment will be used instead of pneumatic or internal combustion <br />powered equipment, where feasible. <br />• Material stockpiles and mobile equipment staging, parking, and maintenance areas will be <br />located as far as practicable from noise- sensitive receivers. <br />• The use of noise- producing signals, including horns, whistles, alarms, and bells, will be for safety <br />warning purposes only. <br />• The onsite construction supervisor will have the responsibility and authority to receive and <br />resolve noise complaints. A clear appeal process to the City will be established prior to <br />construction commencement that will allow for resolution of noise problems that cannot be <br />immediately solved by the site supervisor. <br />• Construction signs will be posted at the project site identifying a contact name and phone <br />number to register noise complaints. <br />Operation Traffic (Offsite Land Uses) <br />Project - Related Traffic Noise. The project Traffic Impact Analysis (TIA) prepared by Fehr & Peers <br />(Appendix D) was used to determine potential traffic impacts from the proposed project. The TIA <br />evaluated operational traffic impacts broken down by phase of the proposed school on the <br />surrounding land uses. Traffic noise levels were analyzed using the FHWA's Traffic Noise Model <br />(TNM). This model analyzes traffic noise based on number of vehicles, traffic mix (automobiles, <br />medium trucks, and heavy trucks), project site geometry with respect to roadways, shielding from <br />structures such as walls or buildings, and other parameters. The most recent version of TNM <br />(version 2.5) was used in this analysis. Using the TIA's estimated peak -hour traffic volumes, TNM <br />calculates noise levels in terms of the peak hour Lq noise level for modeled receivers, To determine <br />the corresponding CNEL, the peak hour noise levels were input into an Excel spreadsheet which <br />models diurnal traffic patterns. <br />Table 3 -16 provides the modeled CNEL dBA noise levels for modeled receivers for existing (2012), <br />existing plus project (2012), opening year (2014), opening year plus project (2014), scenarios. <br />The Bat Nha Buddhist Meditation Center 3 �Z June 2013 <br />Initial Study /Mitigated Negative Declaration ICF 00215.12 <br />31 C -126 <br />
The URL can be used to link to this page
Your browser does not support the video tag.