My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LEE, BRIAN H. -2013
Clerk
>
Contracts / Agreements
>
L
>
LEE, BRIAN H. -2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2013 9:55:13 AM
Creation date
9/18/2013 12:02:41 PM
Metadata
Fields
Template:
Contracts
Company Name
LEE, BRIAN H.
Contract #
N-2013-124
Agency
City Attorney's Office
Expiration Date
1/31/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2013 <br />Exhibit A <br />EXHIBIT A <br />PROFESSIONAL SERVICES PROPOSAL <br />September 11, 2013 <br />below, is the Proposal for Professional Services for the project as follows: <br />For: Jose Sandoval, Chief Assistant City Attorney <br />City of Santa Ana <br />20 Civic Center Plaza <br />Santa Ana, CA 92701 <br />LIMITED DISABLED ACCESS REVIEW <br />Bowers Museum <br />2002 N. Main Street Santa Ana, CA <br />act Description: <br />)rding to the CITY, the project is located within the incorporated boundaries of the City of <br />to Ana California (Orange County)_ The project involves an existing and operating cultural <br />museum facility that was constructed in approximately 1939 and re-commissioned in 1992. <br />CITY is seeking Certified Access Specialist (CASp) consulting services related to a <br />bled access compliance review that is to be conducted in two phases. The Phase I review <br />focus only upon the specific 32 items as addressed in the "Bowers Museum ADA <br />ipliance List' (attached herewith). The Phase II review shall include the balance of the <br />ers Museum facility. Two reports will be prepared by BhLA that address disabled access <br />piiance concerns with the Phase I report limited to the specific 32 items referenced above <br />the Phase 11 report shall be a comprehensive report including both items from Phase I and <br />se It. <br />Slope of Services: <br />BhjLA shall perform a Limited Disabled Access Compliance Review of the above described <br />facility that will be prepared under the guideline provisions for disabled access compliance as <br />id6ritified by the State of California Construction-Related Accessibility Standards Compliance <br />Act (California Senate Bill 1003). The review will be performed with the California Code of <br />Regulations Title 24, 2013 California Building Code (effective January 1, 2014) and the Code <br />of Federal Regulations Title III of the ADA, 2010 ADA Standards for Accessible Design (that <br />became mandatory March 15, 2012). An evaluation report will be prepared that is a <br />summation of compliance findings concerning access by the disabled community to the <br />existing facility. Although options for compliance may be presented in the report, it is not the <br />purpose of the document to provide specific solutions, construction designs or documents, <br />physical layout, or construction services as may be required to remedy any deficiencies <br />Client Initial _ BhtA Iniia <br />Page 1 of 15 <br />%MakingNobd1c /'fan.;'
The URL can be used to link to this page
Your browser does not support the video tag.