Laserfiche WebLink
Chapter4 Mitigation Monitoring and Reporting Program <br />Any concerns between monitors and construction personnel shall be addressed by the City of Santa Ana, <br />Planning Department. <br />4.4 LIST OF MITIGATION MEASURES <br />As mentioned above, due to the program- and project-level components of this EIR, the NIMP has been <br />divided into two parts to address each component separately. The mitigation measures that pertain to <br />implementation of the Overlay Zone and their method of implementation are fisted in Table 4-I. The <br />mitigation measures, which include several mitigation measures from the program-level component, that <br />pertain to the First and Cabrillo Towers project are fisted in Table 42. All project-specific mitigation <br />measures included in the Final EIR for this project would be monitored as described above. <br />The mitigation monitoring matrix on the following pages is formatted to parallel the format of die <br />Executive Summary table contained in die Final EIR. The matrix identifies the required mitigation <br />measures, the time frame for monitoring, and the responsible monitoring agencies. <br />It should be noted that the mitigation measures from Volume I that are contained within Table 4-2 have <br />been modified slightly so as to directly apply to the First and Cabrillo Towers project. The content and <br />action required by each mitigation measure have not been modified. <br />4-2 City of Santa Ana <br />75202