My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH 1901 East First St
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
11/18/2013
>
75A - PH 1901 East First St
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2013 9:26:31 AM
Creation date
11/15/2013 9:01:16 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
11/18/2013
Destruction Year
2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The City finds that none of the conditions described in CEQA Guidelines §15162 requires the <br />preparation of a Subsequent Environmental Impact Report. Specifically, die City has determined <br />the following: <br />No Vubrlantial C/anrges in Cimlilisiances. There are no substantial changes with respect to the existing <br />conditions or circumstances under which the site was evaluated in The Metro East Mixed Use <br />Overlay Zone and Cabrillo Towers EIR. The site has remained in its existing condition <br />approximately seven years after the preparation of The Metro East Mixed Use Overlay Zone and <br />First and Cabrillo Towers EIR There have not been an), substantial changes in the existing <br />environmental setting on the site since the project was approved in 2007. <br />No lVew bforevwion of Sitbriantia/ hsporlarrre. There is no new information of substantial importance, <br />which was not known and could not have been known with the exercise of reasonable diligence at <br />the time the Environmental Impact Report was adopted that shows the project will have one or <br />more significant effects or substantially more severe effects not discussed in the Environmental <br />Impact Report. Except for the new site specific environmental information regarding the proposed <br />development of 254 residential units and 2,424 square feet of retail space on 5.1 acres, the project <br />and its associated impacts all remain the same as contemplated and evaluated in the Environmental <br />Impact Report. There are no mitigation measures that were considerably different from those <br />analyzed in The Metro East Mixed Use Overlay Zone and First and Cabrillo Towers project EIR. <br />Consequently, there is no new information indicating that new significant or substantially more <br />severe environmental effects would result from the development of the project than identified in <br />The Metro East bused Use Overlay Zone and First and Cabrillo Towers EIR. <br />CEQA Guidelines §15164 Addendum to an EIR or Negative Declaration <br />In accordance with CEQA Guidelines §15164, the City, as the lead agency, has prepared this <br />Addendum to the previously adopted Final Environmental Impact Report. The Addendum <br />Checklist is included in Appendix A. As described above, the City has determined the information <br />provided herein will result in none of the conditions described in CEQA Guidelines §15162 <br />requiring the preparation of a Subsequent Environmental Impact Report. <br />Given that none of the conditions requiring preparation of a Subsequent EIR (CEQA Guidelines <br />§15162) are present and only special study upgrades to the previous EIR are necessary to reflect the <br />development proposed for the site, an Addendum to the previously adopted Final Environmental <br />Impact Report is proper and complies with CEQA Guidelines §15164. CEQA Guidelines §15164(x) <br />states, "The lead agency or responsible agency shall prepare an addendum to a previously certified <br />EIR if some changes or additions are necessary, but none of the conditions described in Section <br />15162 calling for preparation of a subsequent EIR have occurred." In the case of the proposed <br />project, none of the conditions in Section 15162 calling for the preparation of a subsequent EIR <br />have occurred. Therefore, the City exercises the right to prepare an Addendum in this case and not <br />a subsequent EIR. <br />CEQA requires that the decision making body consider the Addendum along and in conjunction <br />with The Metro East bfixed Use Overlay Zone and First and Cabrillo Towers Final FIR prior to <br />making a decision on whether or not to approve the Proposed Project. A brief explanation of the <br />decision not to prepare a Subsequent Environmental Impact Report pursuant to Section 15162 <br />1901 East Ficst Street -- Addendum <br />August 14, 2013 <br />75A -101 <br />Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.