Laserfiche WebLink
Environmental Checklist <br />CEQA Cotnpliance <br />XVII. Mandatory Findings of Significance <br />A. Does the project have the potential to degrade the <br />Less Than <br />quality of the environment, substantially reduce the <br />Issues & Supporting Information Sources <br />Potentially <br />Significant with <br />Less Than <br />Significant <br />Mitigation <br />Significant <br />threaten to eliminate a plant or animal community, <br />Impact <br />Incorporated <br />Impact No Impact <br />waste disposal needs? <br />endangered plant or animal or eliminate Important <br />G. Comply with federal, state and local statutes and <br />examples of the major periods of California history or <br />El <br />El <br />regulations related to solid waste? <br />B. Does the project have impacts that are individually <br />XVII. Mandatory Findings of Significance <br />A. Does the project have the potential to degrade the <br />quality of the environment, substantially reduce the <br />habitat of a fish or wildlife species, cause a fish or <br />wildlife population to drop below self- sustaining levels, <br />threaten to eliminate a plant or animal community, <br />❑ ❑ <br />❑ <br />reduce the number or restrict the range of a rare or <br />endangered plant or animal or eliminate Important <br />examples of the major periods of California history or <br />prehistory? <br />B. Does the project have impacts that are individually <br />limited but cumulatively considerable? ( "Cumulatively <br />considerable" means that the incremental effects of a <br />❑ ❑ <br />❑ <br />project are considerable when viewed in connection <br />with the effects of past projects, effects of other current <br />projects and the effects of probable future projects.) <br />C. Does the project have environmental effects which will <br />cause substantial adverse effects on human beings, <br />❑ ❑ <br />❑ Z <br />either directly or indirectly? <br />References <br />A. Metro East Mixed Use Overlay Zone, Final EIR, March 2007, Volume 1. <br />B. Metro East Mixed Use Overlay Zone, First and Cabrillo Towers Project, Final EIR, <br />March 2007, Volume il. <br />Page 12 <br />75A -120 <br />