My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH 1901 East First St
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
11/18/2013
>
75A - PH 1901 East First St
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2013 9:26:31 AM
Creation date
11/15/2013 9:01:16 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
11/18/2013
Destruction Year
2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Activity GHG Emissions <br />The build -out timetable for this project is estimated by CaIEEMod to be between 1 and 2 years. <br />During project construction, the WEEMod computer model predicts that the construction <br />activities will generate the annual CO2(e) emissions identified below. <br />Construction Emissions (Metric Tons CO2(e)) <br />*CMEEMod Output provided in nppendix <br />SCAQMD GHG emissions policy from construction activities is to amortize emissions over a <br />30 -year lifetime. The amortized level is also provided. GHG impacts from construction are <br />considered individually less -than- significant. <br />Project Operational GHG Emissions <br />The input assumptions for operational GHG emissions calculations, and the GHG conversion <br />from consumption to annual regional CO2(e) emissions are summarized in the CaIEEMod output <br />files found in the appendix of this report. <br />The total operational and annualized construction emissions are identified below. <br />Operational Emissions <br />Consumption Source <br />CO2(e) <br />Year 2014 <br />690.3 <br />Year 2015 <br />95.2 <br />%OV6-all Total <br />785.5 <br />Amortized <br />26.2 <br />*CMEEMod Output provided in nppendix <br />SCAQMD GHG emissions policy from construction activities is to amortize emissions over a <br />30 -year lifetime. The amortized level is also provided. GHG impacts from construction are <br />considered individually less -than- significant. <br />Project Operational GHG Emissions <br />The input assumptions for operational GHG emissions calculations, and the GHG conversion <br />from consumption to annual regional CO2(e) emissions are summarized in the CaIEEMod output <br />files found in the appendix of this report. <br />The total operational and annualized construction emissions are identified below. <br />Operational Emissions <br />Consumption Source <br />MT CO2(e) tons/ ear <br />Area Sources <br />172.1 <br />Energy Utilization <br />673.4 _ <br />Mobile Source <br />1644.1 <br />Solid Waste Generation <br />54.3 <br />Water Consum tion <br />112.9 <br />Annualized Construction <br />26.2 <br />Total <br />2,683.0 <br />Total project GHG emissions are less than the proposed significance threshold of 3,500 MT. <br />GI -IG emissions for the proposed project are less than significant. <br />1901 EP5ti AQ -12 <br />75A -133 <br />
The URL can be used to link to this page
Your browser does not support the video tag.