My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AZTECA LANDSCAPE-2015
Clerk
>
Contracts / Agreements
>
A
>
AZTECA LANDSCAPE-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2020 8:16:04 AM
Creation date
1/28/2014 1:04:54 PM
Metadata
Fields
Template:
Contracts
Company Name
AZTECA LANDSCAPE
Contract #
A-2013-109
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
7/15/2013
Insurance Exp Date
9/14/2014
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFP No. 13 -010 <br />Addendum No. 1 <br />Page S of 6 <br />Q23: What are the expectations on pressure washing? <br />A: The contractor shall use the appropriate pressure/hot water washing <br />equipment to remove all stains and foreign materials to achieve a clean <br />pavement around community centers and to the parking lot. <br />Q24: For wastewater capture, what do you require? <br />A: National Pollutant Discharge Elimination System (NPDES) requires that no <br />runoff enter the storm drain system. This should not be a major concern <br />since most of the work occurs inside the park. <br />Q25: What is priority hardscape? <br />A: Tennis and basketball courts are separate. Around building concession and <br />picnic shelters. <br />Q26: Is there any specific value for equipment inspections? <br />A: The City's focus is on work performed, and not on the maintenance of the <br />equipment. Note however if the equipment is not providing a quality result <br />the contractor will be asked to begin providing a quality result to avoid any <br />failures to perform, <br />Q27: If vendor currently has a contract for another City landscaping District, <br />will the vendor have to give that up if awarded District 4? <br />A: Yes. <br />Q28: When adding field composition mix to ball diamond warning tracks the <br />specified type of material to be used is: Stabilizer Solutions Stabilizer <br />Warning Track Mix. Why different composition mix for the ball <br />diamonds? <br />A: Infield mix is different than Wanting Track mix for a reason. The Warning <br />Track mix is designed to "warn" the athlete that they are approaching the <br />home run fence. The product normally has a "crunch" to it so that the <br />athlete not only feels the material but may even hear it beneath him, <br />Q29: Are there any expected annual color in District 4? <br />A: No. <br />Q30: Can you explain how the fields renovated may change from year to <br />year? <br />A: All fields will be renovated each year. The "schedule" of when the <br />renovation occurs may change year to year. <br />
The URL can be used to link to this page
Your browser does not support the video tag.