Laserfiche WebLink
Jerome Park: Field #1 <br />5 Days per wk, Feb 1"to July 15" <br />1 Day per wk, July 16" to Jan 315` <br />Field #2 & #3 <br />1 Days per wk Year round <br />Thornton Park: 5 Days per wk Year round <br />Windsor Park: 3 Days per wk Feb 15c to July 15th <br />1 Day per wk July 16'" to January 315` <br />4.0 Field Composition Mix (Brickdust) To Be Used When Maintaining In- fields. <br />4.1 Field In General <br />4.1.1 When adding field composition mix (brickdust) to any City of Santa Ana ball field, <br />the specific type of material to be used is: <br />Stabilizer Solutions Stabilizer Gold Infield Mix (with stabilizer). <br />4.2 Pitchers Mound /Home Plate /Basepath Areas <br />When adding a mix with a higher clay composition material to any pitcher's mound /home <br />plate /base -path area, the specific type of material to be used is: Hill Topper Home Plate and <br />Mound Mix. <br />4.3 Warning Track <br />When adding field composition mix to ball diamond warning tracks the specified type of material <br />to be used is: Stabilizer Solutions Stabilizer Warning Track Mix. <br />5.0 Equipment <br />The contractor shall provide and have "on hand" at all times during the brickdust maintenance operation <br />the following equipment. <br />5.1 Utility Vehicle <br />Small tight turn radios (13') vehicle designed especially for this type of work. This vehicle shall <br />have the capability to make circle and figure eight patterns completely within the skinned <br />brickdust infield area and not trespass onto adjacent turf areas. Vehicles manufactured by John <br />Deere, Ryan, Toro and Daihatsu may be acceptable. <br />5.2 Drags <br />5.2.1 Scarifying Drag: Used to scratch u p <br />shall be made of heavy -duty steel <br />Digging teeth shall be hardened and <br />shall be included. <br />or loosen up the skinned area. The drag <br />capable of carrying additional weight ('s). <br />pointed and be' /" in diameter. Pull chain <br />District 4 Park Landscape Soecification <br />