My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AZTECA LANDSCAPE-2015
Clerk
>
Contracts / Agreements
>
A
>
AZTECA LANDSCAPE-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2020 8:16:04 AM
Creation date
1/28/2014 1:04:54 PM
Metadata
Fields
Template:
Contracts
Company Name
AZTECA LANDSCAPE
Contract #
A-2013-109
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
7/15/2013
Insurance Exp Date
9/14/2014
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
direct the work of fully equipped, competent and experienced crews as well as all safety equipment, <br />including but not limited to, all equipment and work procedures required by ANSI 2133.1 -1994. The <br />Contractor shall secure all timekeeping, bookkeeping and other necessary clerical and office work <br />required in the performance of the contract. <br />The Contractor shall be responsible for the supervision of all of his crews. He shall check all of his <br />crews regularly for proper quantity and quality of work, proper maintenance of tools and equipment, and <br />safety. <br />2.04 SUBSTITUTIONS <br />Whenever a specific type of material is specified, no substitutions shall be allowed without written <br />consent of the SAPRF representative. <br />2.05 CERTIFICATION OF MATERIALS <br />All materials shall be delivered on the site in original containers. Materials shall be subject to inspection <br />by the ARMD representative. The SAPRF representative will not approve materials not meeting the <br />SAPRF standards, and Contractor shall return any such non - satisfactory items at his /her cost. <br />2.06 CONTRACTOR NEGLECT <br />Any damage to the City of Santa Ana, SAPRF, or private property, which has been determined to be <br />due to the Contractor's neglect, shall be corrected at no additional cost to the City of Santa Ana or the <br />SAPRF. <br />2.07 HOURS OF OPERATION <br />The Contractor shall perform all work between the hours of 7:00 a.m. and 4:00 p.m., Monday through <br />Friday. No work shall be performed on weekends or on City recognized holidays without written <br />SAPRF approval. <br />2.08 SPECIFICATIONS AND PLANS <br />The work performed shall be done in accordance with the Standard Specifications for Public Works <br />Construction, latest edition, hereinafter referred to as Standard Specifications. In case of conflict <br />between the Standard Specifications and this Specification, this Specification shall take precedence <br />over and be used in lieu of such conflicting portions. <br />Where the plans or specifications describe portions of work in general terms, but not complete detail, it <br />is understood that workmanship of the finest quality is to be used. Unless otherwise specified, the <br />Contractor shall furnish all labor, materials, tools, equipment and incidentals and do all the work <br />involved in executing the contract. <br />2.09 CONSTRUCTION EQUIPMENT <br />The Contractor shall take all necessary precautions for safe operation of his equipment and the <br />protection of the public from injury and damage from such equipment. <br />2.10 SOUND CONTROL REQUIREMENTS <br />The Contractor shall comply with all local sound control and noise level rules, regulations and <br />ordinances that apply to any work performed pursuant to the Contract. Each internal combustion <br />engine used for any purpose on the job or related to the job shall be equipped with a muffler of a type <br />recommended by the manufacturer of such equipment. No internal combustion engine shall be <br />operated on the project without said muffler. Full compensation for conforming to the requirements of <br />this section shall be considered as included in the prices paid for the various contract items of work <br />involved and no additional compensation will be allowed therefore. Sounds, such as loud music, that <br />are not related to the project, shall be kept at levels so as to not disturb the general public. <br />2.11 TRAFFIC CONTROL <br />The Contractor shall notify the SAPRF representative of intent to begin the contract work at least five <br />Iiic+rlr +A Park I anricrana Snarifiratinn <br />
The URL can be used to link to this page
Your browser does not support the video tag.