My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EXHIBIT 4-1_55A_BRISTOL WIDENING EIS-EIR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
02/04/2014
>
EXHIBIT 4-1_55A_BRISTOL WIDENING EIS-EIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 7:46:43 AM
Creation date
1/29/2014 3:20:49 PM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
55A
Date
2/4/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
414
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br />a. Whether project emissions have been considered in formu- <br />lating the NAP, and are consistent with emission reduction *� <br />requirements of the State Implementation Plan (SIP); <br />b. Project consistency with the transportation control measures <br />in the SIP and the Regional Transportation Plan; and <br />c. Whether any project- associated population growth is <br />consistent with the population projections in the NAP. -- <br />4. We suggest that you use the Air Quality Handbook for Environ- <br />mental Impact Reports published by the SCAQMD for further <br />guidance on air quality analysis. <br />Alternatives and Mitigation <br />S. Existing mass /public transit available in the project area <br />should be discussed. The DEIS should analyze potential <br />mass /public transit options and identify means to encourage ,. <br />their use. <br />6. For each alternative, the DEIS should discuss appropriate <br />mitigation measures for air quality impacts associated with <br />use of the modified highway and with project construction. <br />The DEIS should analyze the effect of mitigation measures <br />and make clear commitments to implement mitigation. .. <br />WATER QUALITY COMMENT <br />For each alternative, the DEIS should discuss the project's <br />compliance with State and local water quality management plans <br />and State - adopted, EPA - approved water quality standards. If .w <br />water quality impacts are identified, the DEIS should also iden- <br />tify appropriate measures to avoid or mitigate for these impacts, <br />both during and after project construction. <br />Air Quality Comments <br />Comments Nos. 1 through 4 are addressed in Sections III. A. 6. and M H. of the <br />FEIS. <br />Comment No. 5 is addressed in Section H. C. of the FEIS. <br />Comment No. 6 is addressed in Section IV. H. of the FEIS. W <br />Water Qm"fDmment• ~- <br />Comment is addressed in Section IV. F of the FEIS. <br />ix -ia <br />
The URL can be used to link to this page
Your browser does not support the video tag.