My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EXHIBIT 4-1_55A_BRISTOL WIDENING EIS-EIR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
02/04/2014
>
EXHIBIT 4-1_55A_BRISTOL WIDENING EIS-EIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 7:46:43 AM
Creation date
1/29/2014 3:20:49 PM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
55A
Date
2/4/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
414
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o� a <br />ORANGE COUNTY TRANSIT DISTRICT <br />Dear Mr. Alvarez: <br />SUBJECT: NCP EIR /EIS BRISTOL STREET WIDENING <br />We have reviewed this project as described in the NOP and have the fol- <br />lowing comments: <br />• OCTD presently offers service along the entire project length, as <br />indicated on the attached route maps and schedules, with a number <br />of bus stops within the project area, as shown on Table 1. <br />• As shown on Table 1, OCTD has a number of on- street stops lo- <br />cated in the vicinity of several intersections along the project <br />length. It appears that the mid -block cross sections would be <br />sufficient to accommodate on-- street stops, but our concern is <br />that this travel lane may narrow as it approaches an <br />intersection. If this is the case, turnouts may need to be <br />provided in order to insure smooth traffic flow through these <br />areas. <br />• In order to minimize construction related disruption and delays <br />to the District's fixed route service, the maximum number of <br />lanes should remain open during the widening project. In addi- <br />tion, we would appreciate coordination of the construction <br />period with our Bus Operations staff. Please contact the fol- <br />lowing staff person during final design and prior to beginning <br />construction, to coordinate access to bus stops and bus vehicle <br />movements through the project area during construction: <br />Mr. Mannie Thomas <br />Supervisor, Communications and Operations <br />Orange County Transit District <br />P.O. Box 3405 <br />Garden Grove, CA 92642 <br />(714) 530 -5910 <br />11222 ACACIA PARKWAY ■ P O. EOX �3005 • GAROEN GROVE, CALIFCRN[A 92642 • [714) 971 -5200 <br />lv_n& <br />ON <br />w- <br />4_ <br />July 23, 1987 <br />4 <br />NJ <br />° as <br />w <br />� A <br />4 <br />Mr. George Alvarez <br />rn <br />x <br />City of Santa Ana, Public Services Agency <br />P.D. Boa 1988 M -21 <br />. <br />Santa Ana, CA 92702 ' <br />Dear Mr. Alvarez: <br />SUBJECT: NCP EIR /EIS BRISTOL STREET WIDENING <br />We have reviewed this project as described in the NOP and have the fol- <br />lowing comments: <br />• OCTD presently offers service along the entire project length, as <br />indicated on the attached route maps and schedules, with a number <br />of bus stops within the project area, as shown on Table 1. <br />• As shown on Table 1, OCTD has a number of on- street stops lo- <br />cated in the vicinity of several intersections along the project <br />length. It appears that the mid -block cross sections would be <br />sufficient to accommodate on-- street stops, but our concern is <br />that this travel lane may narrow as it approaches an <br />intersection. If this is the case, turnouts may need to be <br />provided in order to insure smooth traffic flow through these <br />areas. <br />• In order to minimize construction related disruption and delays <br />to the District's fixed route service, the maximum number of <br />lanes should remain open during the widening project. In addi- <br />tion, we would appreciate coordination of the construction <br />period with our Bus Operations staff. Please contact the fol- <br />lowing staff person during final design and prior to beginning <br />construction, to coordinate access to bus stops and bus vehicle <br />movements through the project area during construction: <br />Mr. Mannie Thomas <br />Supervisor, Communications and Operations <br />Orange County Transit District <br />P.O. Box 3405 <br />Garden Grove, CA 92642 <br />(714) 530 -5910 <br />11222 ACACIA PARKWAY ■ P O. EOX �3005 • GAROEN GROVE, CALIFCRN[A 92642 • [714) 971 -5200 <br />lv_n& <br />ON <br />w- <br />
The URL can be used to link to this page
Your browser does not support the video tag.