My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EXHIBIT 4-1_55A_BRISTOL WIDENING EIS-EIR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
02/04/2014
>
EXHIBIT 4-1_55A_BRISTOL WIDENING EIS-EIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 7:46:43 AM
Creation date
1/29/2014 3:20:49 PM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
55A
Date
2/4/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
414
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
°?'iN# <br />CITY OF SANTA ANA <br />BRISTOL STREET WIDENING PROJECT <br />SCOPING MEETING <br />WEDNESDAY, DECEMBER 10, 1986 <br />MINUTES <br />Introductory Remarks <br />Meeting Convened: 7:05 p.m. <br />Mr. Kim Schultz ( moderator) - Introduction <br />Mr. Michael Betts (project coordinator) - Purpose of meeting. overview <br />Mr. George Alvarez (traffic engineer, City of Santa Ana) - Description of the <br />necessity for the project (safety). The project will improve signaliza- <br />tion, lighting, access and relieve congestion. <br />Mr. Victor Martinez (traffic engineer, Willdan Associates) -- Description of the <br />project alternatives and the 100' and 120' roadway cross sections. <br />Details and costs to be developed at a later stage and incorporated into <br />the EIS. <br />Ms. Sandra Massa- Lavitt (planner, City of Santa Ana) - statement that the <br />temporary setback ordinance was no longer under consideration by <br />the City. <br />Mr. Ernie Egger (planner, Willdan Associates) - Description of the environ- <br />mental review process including topics under consideration, project <br />phasing and EIS time table. <br />Mr. Michael Green (real property agent. Willdan Associates) - Description of <br />property acquisition procedures. <br />Also present: Patti Nunn (City of Santa Ana), Barry Dee (Willdan <br />Associates). <br />Public Comment Period <br />Question (Q) , Comment (C) , Response (R) . <br />Q: Is the appraisal for fair maket value? <br />R: (Green) Yes. <br />Q: How are appraisers chosen? <br />R: (Green) Bid to the City by independent contractors. <br />Q: What percentage of people are satisfied with their settlement? <br />R: (Green) 90 -95 percent in his experience. <br />C: The purpose of the restrictions on Flower Street was to divert traffic to <br />other nearby streets such as Bristol Street. The City ignored resident's <br />concerns on this previous issue. The issue is whether north -south <br />streets should be restricted at all. Aliowing commercial development on <br />Flower Street is the cause of traffic problems. <br />
The URL can be used to link to this page
Your browser does not support the video tag.