My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH - AMEND GENERAL PLAN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
02/04/2014
>
75A - PH - AMEND GENERAL PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 7:49:20 AM
Creation date
1/30/2014 4:19:04 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
2/4/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2014 -2021 SANTA ANA HOUSING ELEMENT AND PUBLIC SAFETY ELEMENT UPDATES <br />CITY OF SANTA ANA <br />1. Introduction <br />Table 2 Housing Projects and Sites Approved between 2009 and 2012 to Accommodate the 2006.2014 <br />Carryover <br />Projects <br />Affordability Level <br />Low <br />Very Low <br />1 Low <br />Moderate <br />Above <br />Total <br />10 E, Hutton Centre <br />(81 -120% of MFI ) <br />above MFI) <br />Total <br />2014 -2021 RHNA <br />45 <br />Subtotal - Units in Pipeline <br />98 <br />1 50 <br />5 <br />1,390 <br />1,542 <br />Remaining Balance of 2006.2014 RHNA Allocation <br />987 <br />-• <br />•- <br />•- <br />Units not Accounted in 2009 Housing Element <br />(Built Units+ Pipeline Projects) <br />786 <br />-• <br />•- <br />•- <br />2006 -2014 Carryover <br />111 <br />90 <br />37 <br />90 <br />201 <br />Source: Santa Ana 2013, <br />A projector zoning change that was not counted in the previous housing element, but was entitled or adopted prior to the end of the 2006-2014 planning period. The <br />units are counted toward the remaining 2006 -2014 RHEA. <br />4, These projects are in the development pipeline and are pending entitlements, Affordable units are counted toward the remaining 2006 -2014 RHNA. <br />8, While these projects were IdentiFled in the 2006 -2014 Housing Element, they are expected to be constructed in 2014 -2021 plan hill period. <br />Carrying over the remaining 201 units required under the 2006 -2014 RHNA, Table 3 reflects the total <br />number of housing units needed to achieve both the 2006 -2014 and 20142021 RHNA requirements. The <br />table also categorizes the remaining housing unit need based on affordability level. The proposed project <br />would need to accommodate a combined RHNA of 405 units to meet the 2014 -2021 RHNA goals. <br />Table 3 Regional Housing Needs Allocation 2014 -2021 <br />Source , SCAG 2012, <br />Note: Household goals based on 2010 Census County Median Family Income ($83,735). <br />Available Land for Housing <br />The 2014 -2021 Housing Element Update must identify available sites in the City that can accommodate <br />the remaining RFINA (405 units). The first step in identifying adequate sites is preparing an inventory of <br />land suitable for residential development that includes vacant and underutilized land. The assessment, as <br />described in the proposed Housing Element, has identified the Metro East area, the Harbor Corridor <br />Specific Plan, transit corridors along First Street and Fifth Street, and Transit Zoning Code (TZC) areas <br />as areas that could accommodate RHNA required housing. These areas can be seen in Figure 4, Development <br />Focus Arear in Santa Ana. Table 4 identifies the menu of development areas that the City has determined <br />would be more than sufficient to accommodate the remaining RHNA allocation. The ultimate residential <br />capacity of these areas is much larger than the remaining RHNA. However, to be conservative, the City only <br />projects a portion of the development potential for the 2014 -2021 planning period. Additionally, the units in <br />Table 4 are in addition to the number of units shown in Table 2 that accommodate the 2006 -2014 carryover. <br />Page 12 • The Planning Center I DC&E December 2013 <br />75A -34 <br />Very Low <br />Low <br />Moderate <br />Above Moderate (120 <br />(0 -50% of ME[) <br />(51-80% of MFI) <br />(81 -120% of MFI ) <br />above MFI) <br />Total <br />2014 -2021 RHNA <br />45 <br />32 <br />37 <br />90 <br />204 <br />Carryover 2006 -2014 <br />RHNA <br />111 <br />90 <br />0 <br />0 <br />201 <br />Combined RHNA <br />156 <br />122 <br />37 <br />90 <br />405 <br />Source , SCAG 2012, <br />Note: Household goals based on 2010 Census County Median Family Income ($83,735). <br />Available Land for Housing <br />The 2014 -2021 Housing Element Update must identify available sites in the City that can accommodate <br />the remaining RFINA (405 units). The first step in identifying adequate sites is preparing an inventory of <br />land suitable for residential development that includes vacant and underutilized land. The assessment, as <br />described in the proposed Housing Element, has identified the Metro East area, the Harbor Corridor <br />Specific Plan, transit corridors along First Street and Fifth Street, and Transit Zoning Code (TZC) areas <br />as areas that could accommodate RHNA required housing. These areas can be seen in Figure 4, Development <br />Focus Arear in Santa Ana. Table 4 identifies the menu of development areas that the City has determined <br />would be more than sufficient to accommodate the remaining RHNA allocation. The ultimate residential <br />capacity of these areas is much larger than the remaining RHNA. However, to be conservative, the City only <br />projects a portion of the development potential for the 2014 -2021 planning period. Additionally, the units in <br />Table 4 are in addition to the number of units shown in Table 2 that accommodate the 2006 -2014 carryover. <br />Page 12 • The Planning Center I DC&E December 2013 <br />75A -34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.