My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2014-02-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
02/18/2014
>
FULL PACKET_2014-02-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 7:53:58 AM
Creation date
2/18/2014 8:23:37 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
2/18/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sonta Ana, CAI SANITARY SEWER AND WATER FINANCIAL PLAN <br />Scenario Plann <br />1, Navigation Features— provides titers withthe ability to navigate throughout the Model from <br />anyworksheot. <br />2. Summary of sign! [ice of output Irate revenue incretsosend debt service coverage) and override <br />functions used In scene rio analysis. <br />3. Summary graph showing a novel target balances (bars) and so tool turns Ibalances(diamonds) — <br />Fiscal years 2010 through 2012 show actual balances aline target level, indicating a rate revenue <br />adjustment is required to achieve these balances. <br />4. Summary graph showing a on ual target (horizontal lin as) and a ctu ad debt service coverall a (bars) — <br />Fisoolye ars 2909 and 2010 show actual coverage at the target level, Ind testing a rate revenue adjustment <br />Is required to achieve these results. <br />6. Summary graph showing the source of proceeds used to fund thaOR . These results are based onuser <br />designated funding selected on the CIP worksheet. <br />6. Summary graph showing a ran a Irate revenue adjustments. <br />Task 8-- Meetings, Reports and Presentations <br />The objective of this task is to identify meetings and deliverables for the <br />City. Specific subtasks are: <br />8.1 Attend at minimum one (1) monthly meeting with City staff. <br />Schedule conference calls as needed to update staff on progress of <br />the R &R Program and rate models, <br />8.2 Draft Report <br />U1 Document the preliminary findings associated with the R &R <br />Program <br />RI Document preliminary findings of financial plan, cost of service <br />and recommended rate structure <br />M Present draft report to the Water Resources Division, Finance <br />Department and member of City Council, as desired <br />BLACK & VEATCH I Methodology <br />25C -17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.