My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH - EIR -1584 E SANTA CLARA AVE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
03/04/2014
>
75A - PH - EIR -1584 E SANTA CLARA AVE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2014 5:04:05 PM
Creation date
2/27/2014 4:53:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
3/4/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KOA +CORPORATION <br />,.K PLANNING& ENGINEERING <br />Table 3 <br />Roadway Segment Future With Project Level of Service <br />Table 4 <br />Roadway Segment Buildout With Project Level of Service <br />Future <br />LOS "D" <br />Future <br />Street <br />Between <br />And <br />ADT <br />Capacity <br />Level of <br />Volume <br />Capacity. <br />Service <br />Santa Clara Avenue <br />Wright Street <br />Lyon Street <br />9,370 <br />1 1,300 <br />C <br />Wright Street <br />Santa Clara Ave <br />17 "' Street <br />2;962 <br />5;000 <br />A <br />Avalon Avenue <br />Wright Street <br />Lyon Street <br />423 <br />2,000 <br />A <br />Table 4 <br />Roadway Segment Buildout With Project Level of Service <br />Significant Impacts <br />Table 5 presents a comparison of existing and future study scenarios for intersections affected by the change in <br />project trip distribution, Table 6 presents a comparison of existing and buildout study scenarios for these <br />intersections. Traffic impacts created by the project can be calculated by comparing the "Future. With Project" <br />conditions to the "Future Without Project' conditions, or the " Buildout With Project" conditions to the <br />" Buildout Without Project" conditions. Significant traffic impacts are determined using the criteria presented in <br />the report "Traffic Impact Study for the TAVA Homes Project at 1584 East Santa Clara Avenue in the City of Santa Ana ", <br />March 14, 2011, by KOA Corporation. <br />TAVA Homes Supplemental Traffic Analysis <br />July 18,2013 <br />75A -132 <br />Future <br />LOS "D" <br />'Future <br />Street <br />Between <br />And <br />ADT <br />Level of <br />Volume <br />Capacity. <br />Service <br />Santa Clara Avenue <br />Wright Street <br />Lyon Street <br />12,493 <br />11,300 <br />E <br />Wright Street: <br />Santa Clara Ave <br />17`h Street <br />3,335 <br />5,000 <br />B.. <br />Avalon Avenue <br />Wright Street <br />Lyon Street <br />415 <br />2,000 <br />A <br />Significant Impacts <br />Table 5 presents a comparison of existing and future study scenarios for intersections affected by the change in <br />project trip distribution, Table 6 presents a comparison of existing and buildout study scenarios for these <br />intersections. Traffic impacts created by the project can be calculated by comparing the "Future. With Project" <br />conditions to the "Future Without Project' conditions, or the " Buildout With Project" conditions to the <br />" Buildout Without Project" conditions. Significant traffic impacts are determined using the criteria presented in <br />the report "Traffic Impact Study for the TAVA Homes Project at 1584 East Santa Clara Avenue in the City of Santa Ana ", <br />March 14, 2011, by KOA Corporation. <br />TAVA Homes Supplemental Traffic Analysis <br />July 18,2013 <br />75A -132 <br />
The URL can be used to link to this page
Your browser does not support the video tag.