Laserfiche WebLink
Cultural resource surveys <br />Phase I and Phase II environmental site assessments <br />Hazardous materials characterization and remediation <br />Noise studies, including sound measurement and impact modeling <br />Where more detailed studies are required (e.g., for issues such as traffic), we have excellent and <br />long- standing relationships with subconsultants specifically qualified for those reports, <br />including Kunzman Associates. <br />Draft ND /MND: Assuming that the IS does not identify any significant impacts, Rincon <br />will prepare an ND or MND. We will also prepare and circulate a notice of intent to <br />adopt an ND /MND, per the CEQA Guidelines. <br />4. Final ND /MND: Rincon will prepare a Final ND /MND after the close of the public <br />review period. The Final ND /MND will include all comments received by the City <br />during public review and responses to those comments (note that although preparation <br />of written responses is not required for NDs /MNDs, most agencies demonstrate that <br />comments have been considered by preparing written responses). An administrative <br />draft version of the responses to comments will be submitted to the City for review and <br />comment. Once City comments on the administrative draft document are received, a <br />Final ND /MND (ND /MND plus responses to comments) will be prepared.'If mitigation <br />measures are required, the final ND /MND will also include a mitigation monitoring <br />and reporting program (MMRP) outlining how the City will ensure that required <br />measures are implemented. <br />5. Meetings and Presentations: The number of public hearings and meetings with City <br />staff, other public agencies and applicant representatives will be identified based on <br />each specific project. <br />Environmental Impact Reports <br />Larger projects that have unavoidably significant environmental impacts will require <br />environmental impact reports (EIRs), which will involve the steps described below. The FIR <br />process will typically take 9 -12 months. <br />1. Project Description: Rincon will prepare a detailed project description to be used as the <br />basis of the IS and EIR. The project description will also be suitable for inclusion in staff <br />reports or other presentations. A summarized version of the project description will be <br />prepared for public notices, including the NOR <br />2. IS: Rincon will prepare an IS based on CEQA Guidelines. As noted above, we have in- <br />house technical expertise to prepare supporting studies for nearly all of the items on the <br />Initial Study Checklist. <br />3. NOP: When an FIR is required, Rincon will prepare and circulate an NOP of a Draft FIR, <br />notifying the public and agencies that an EIR will be prepared for the project. This <br />document will typically be circulated with the IS for a period of 30 days. <br />