Laserfiche WebLink
CW of Santa Ana -Park View at Town and Country Manor <br />Draft EIR <br />3.3 - Project Objectives <br />The objectives of the proposed Park View at Town and Country Manor Project are to: <br />• Respond to the need for active adult and senior housing opportunities within the City of Santa <br />Ana by providing a senior residential living facility. <br />• Complete development of the Town and Country Manor in a cohesive manner, aesthetically <br />and operationally integrating the individual existing and proposed development components. <br />• Maximize utilization for residential development of the southwest corner of the Town and <br />Country Manor campus adjacent to the existing District Center area along Main Street, joining <br />together with Main Place Mall and City Place development to form a master planned mixed <br />use area. <br />• Add to existing development in the District Center land use area along Main Street with project <br />components that are compatible in scale and consistent with the architectural styles and <br />character of the area, and that provides a positive contribution to neighborhood identity. <br />• Develop the project site according to good urban design principles, acknowledging the <br />importance of the project as part of the City's North Main development corridor and District <br />Center land use area along Main Street, with proper attention to landscape design and planning <br />for pedestrian access. <br />• Maximize the advantages of the site's location close to Main Street in terms of its visibility and <br />proximity to the Garden Grove (SR -22) and Santa Ana (I -5) freeways. <br />• Provide a project that contributes to the continued revitalization of the northeastern part of the <br />City of Santa Ana. <br />3.4- <br />Pursuant to Section 15367 of the CEQA Guidelines, the City of Santa Ana is the Lead Agency in the <br />preparation of this Draft FIR. Further actions or procedures requiring approvals by the City of Santa <br />Ana in order to allow implementation of the proposed project are anticipated to include, but may not <br />be limited to, the following: <br />1. General Plan Amendment to District Center Land Use Designation. <br />2. Zone Change to Specific Development Zoning Designation. <br />3. Site Plan Approval. <br />4. Final FIR Certification. <br />5. Approval of Grading Permits. <br />6. Approval of Building Permits. <br />Other agencies whose approval may be required include, but are not limited to: Regional Water <br />Quality Control Board, Santa Ana Region; and the South Coast Air Quality Management District. <br />3-12 Michael Bmndman Associates <br />H t( PNJN )b327b327W3�EM'D32700306eW3-00 Ryect Deecriptmadac <br />