Laserfiche WebLink
ow <br />RecyclinJ.com <br />RE: Main St. Property <br />Fregoso, Vince <VFregoso @santaana.org> <br />To: Ryan Bloom <rbloom@ocrecycling.com> <br />Hi Ryan, <br />Fri, May 30, 2014 at 11:24 AM <br />I hope you had a nice vacation. After researching the property in question, the zoning will allow you to <br />operate a recycling facility at this location. Before we can issue you a certificate of occupancy for this new <br />facility, you will need to submit plans that show that your use will be in compliance with the Light <br />Industrial (M -1) standards as well as the Recycling Facilities standards. After visitingthe site and <br />reviewing the codes, I have identified the issues that you need to address on a plan: <br />1. A solid wall not less than 8feet in height must be constructed around the perimeter of the property. <br />This will require you to replace the existing wood fence around most of the perimeter of the property <br />(Section 41- 473b). <br />2. The compounding and /or processing of the recyclables must be within a completely enclosed <br />building. The processing /compounding cannot be located undera canopy (Section 41-473e). <br />3. The site needs to comply with the Light Industrial (M -I) landscape setback standards. Please show <br />the landscaped setback on a site plan [Section 41- 1255(6)]. <br />4. All exterior storage of materials will need to be within sturdy containers [Section 41- 1255(7)]. <br />S. Let me know if your facility will be accepting customers. If so, you will need to show how vehicular <br />circulation and recyclable deposits will occur. And, a minimum of 10p a rking spaces need to be provided <br />for customers [Section 41- 1255(9)]. <br />6. Since you are located within 500feet of a residential use (directly south of the site), your operating <br />hours are limited to 7 am to 7 pm. Please add this note to the plans [Section 41- 1255(12)). <br />Once you get your plans finalized, feel free to contact me so we can meet meat the counter. I can take a <br />quick look at the plans to be sure you have addressed all of the issues. Let me know if you need any other <br />information. <br />Thanks, <br />Vince C. Fregoso, AICP <br />