Laserfiche WebLink
SANTA ANA ZOO Ao9REEMENT CONT'D <br />6) A. D.A. RAMP. DECK. SrAIRS . RAZ5 PLAN: <br />PROVIDE ENGINEERED ENTRY DECK, RAMP, ST AIRS HANDRAIL PLANS. <br />UTILIZE T.M.P. MANUFACTURING OR EQUAL. <br />J ENGINEER'S DRAWINGSlREVIEW, <br />IF ENGINEER NEEDS TO REVIEW AND STAMP PLAN PLANS, <br />HIS FEE WILL BE ADDITIONAL TO OUR AGREEMENT. <br />FIRE SPRINKLER PLAN: NOT INCL UDED IN THIS PROPOSAL. <br />0 GREEN CODE COMPLIANCE: PROPOSED NEW MODULAR <br />BUILDING WILL COMPLY WITH CURRENT GREEN CODE. <br />EXCLUSIONS <br />>ORADINO PLAN, TOPOGRAPHIC PLAN <br />NOTE -WE WILL INCLUDE SITE SURVEY TO INVOL VEMINOR <br />SITE GRADING TO ELEVATE THE BUILDING FOR POSITIVE DRAINAGE <br />AWAYFROM BUILDINOPERIMETERS, <br />,,SOILS TESTING, SOILS REPORT <br />>FIRE DEPT PLANS, FIRE SPRINKLER PLANS, ON SITE FIRE LINE, <br />RISER, POSTINDICATOR, ETC, FIREALARM PLAN. <br />>CITY PLAN CHECK FEES, SUBMITTAL FEES, PERMITFEE5, INSPECTION <br />FEES, ANY FEES. <br />>ENOINEERI'NG FEES IF NOT REFERENCED IN ABOVE SCOPE OF WORK <br />>PHONE /DA TAICABL E PL ANS <br />>WE ASSUME PERMITS /PROCUREMENT BY CHOSEN VENDOR <br />ONCE PLANS ARE APPROVED BY CITY OF SANTA ANA, CA. <br />>5TORMWATER PLAN <br />PRICING: FOR ABOVE REFERENCED SCOPE OF WORK, INCL UDINO <br />VISITS TO PROJECT SrTE FOR REQUIRED FIELD DATA, <br />INCLUDING ALL BLUEPRINT /REPRODUCTION COSTS FOR <br />SUBMITTAL PLAN5ETS AS REFERENCED --------- $5,680.00 <br />(FORTY NINE HUNDRED EI6HTY DOLLARS) <br />PAYMENT TERMS: <br />PAYMENT #1: 15% UPON SIGNED CONTRACT --------- $ 85200 <br />PAYMENT #2 85% UPON PLANS SUBMITTED <br />TO CITY OF SANTA ANA ---------------- $4,828.00 <br />REGARDS, <br />JOHN TAYLOR CONSTRUCTION, INC. <br />d. b. a. JTPLAN5 <br />1335 HEDIONDA A VE <br />VISTA, CA 92081 SHEET- 3 OF 3 <br />