My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - EIR 1584 SANTA CLARA
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
09/02/2014
>
75B - PH - EIR 1584 SANTA CLARA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2014 4:18:57 PM
Creation date
8/28/2014 3:54:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75B
Date
9/2/2014
Destruction Year
2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
604
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�p I{OA CORPORATION <br />KANNING & ENGINEFRING <br />Forecast Peak Hour Intersection Level of Service <br />The future "WITH Project" intersection level of service in the AM and PM peak hours for intersections affected <br />by the change in trip distribution is summarized in Table I below. The buildout "WITH Project" intersection level <br />of service for the "WITH Project" conditions is summarized in Table 2. <br />Table 1 <br />AM/PM Peak Hour Intersection Performance <br />Future WITH Project Conditions <br />Intersection <br />AM Peak Hour <br />PM Peak Hour <br />Unsignalized Intersections (Level of Service I Delay) <br />Delay 2 <br />LOS 2 <br />Delay 2 <br />LOS 2 <br />Santa Clara Avenue at Wright Street <br />14.5 <br />B <br />34.3 <br />D <br />Santa Clara Avenue at Project Access <br />11.3 <br />B <br />13.9 <br />B <br />Wright Street at Avalon Avenue <br />9.9 <br />A <br />9.6 <br />A <br />Note 1: For intersections affected by change in project trip distribution <br />Note 2: LOS = Level of Service; Delay in Seconds /Vehicle Average <br />Table 2 <br />AM/PM Peale Hour Intersection Performance r <br />Buildout WITH Project Conditions <br />Intersection <br />AM Peak Hour <br />PM Peak Hour <br />Unsignalized Intersections (Level of Service I Delay) <br />Delay 2 <br />LOS 2 <br />Delay 2 <br />LOS 2 <br />Santa Clara Avenue at Wright Street <br />18.0 <br />C <br />84.9 <br />F <br />Santa Clara Avenue at Project Access <br />11.7 <br />B <br />14.8 <br />B <br />Wright Street at Avalon Avenue <br />10.3 <br />B <br />9.8 <br />A <br />Note I: for intersections affected by change in project trip distribution <br />Note 2: LOS = Level of Service; Delay in Seconds /Vehicle Average <br />Forecast Street Segment Conditions <br />Figures S and 6 illustrate the Future With Project and Buildout With Project average daily traffic (ADT) volumes, <br />respectively, for the roadways affected by the change in project trip distribution. Tables 3 and 4 present the daily <br />traffic volume segment analysis for these street segments. <br />FAVA Homes Supplemental Traffic Analysis <br />July 18, 2013 <br />75B -128 <br />
The URL can be used to link to this page
Your browser does not support the video tag.