Laserfiche WebLink
KOA CORPORATION <br />NANNING & ENGIWEVONG <br />Stop delay on Santa Clara Avenue at Wright Street is expected to increase by 3.6 seconds in the PM peak hour <br />under buildout conditions due to the proposed project. Level of Service is at LOS F under these conditions. The <br />proposed project contributes 9 trips to the intersection in the PM peak hour. The poor level of service reported <br />for Santa Clara Avenue /Wright Street is due to the northbound left movement of vehicles turning from the minor <br />leg (Wright Street) onto the major street (Santa Clara Avenue). Mitigation measures are recommended at this <br />location to maintain an adequate intersection level of service. Possible measures include installation of a traffic <br />signal or by construction of a roundabout or wide (14 -foot) 2 -way left -turn lane. These measures are the same as <br />recommended in the previous (201 1) traffic study. <br />Traffic signal warrants were tested for the intersection of Santa Clara Avenue at Wright Street. Under near -term <br />traffic conditions, the 8 -hour Interruption of Continuous Traffic Warrant was met. Under buildout with project <br />traffic conditions, the Peak Hour Warrant and the 8 -hour Interruption of Continuous Traffic Warrant were both <br />met. <br />Conclusions <br />The intersection level of service analysis conducted for the proposed site plan change and revised project trip <br />distribution determined that there is a significant impact to one intersection, Santa Clara Avenue at Wright Street, <br />as a result of the project. This is the same conclusion as reached in the previous (201 1) traffic study. Mitigation <br />measures will be required at this intersection. Recommended measures include a traffic signal, roundabout, or <br />wide (14 -foot) 2 -way left -turn lane. Again, the recommended mitigation measures are the same as recommended <br />in the previous (201 1) traffic study. <br />Expected street segment level of service on Santa Clara Avenue between Grand Avenue and Tustin Avenue <br />conducted for the revised project trip distribution under Buildout With Project conditions is poor (Level E). The <br />expected LOS E conditions are due to a combination of existing traffic volumes and ambient traffic growth, not as <br />a result of added traffic volumes from the project. <br />KOA Corporation hopes that the review and recommendations conducted for the revised site plan and trip <br />distribution for the TAVA Homes project will assist the City in evaluating the potential traffic impacts and <br />mitigation measures of the proposed project. KOA is available to assist the City in any further traffic analysis of <br />the project area as needed. <br />TAVA Homes Supplemental Traffic Analysis <br />July 18, 2013 <br />75B -133 <br />