My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - EIR 1584 SANTA CLARA
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
09/02/2014
>
75B - PH - EIR 1584 SANTA CLARA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2014 4:18:57 PM
Creation date
8/28/2014 3:54:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75B
Date
9/2/2014
Destruction Year
2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
604
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mpnday; July 29, 2013 Daily Appall <br />E. Roadway Mitigation <br />(1) Record <br />The plan is for aggregate mined in the Project <br />to beremoVed from die site by trucks travelling on <br />Kunzler Ranch Road to North State Street There <br />appears to be no dispute that Kunzler Ranch Road <br />is fire ,only point of ingress and egress to the <br />Project site,' The Draft estimated that the mining <br />could involve bp to 176 truck trips per day each <br />hauling 25 ton loads. <br />According to the Draft, "[11 ocal roadways, such <br />as Kunzler dtanch Road and North State Street <br />.. are generally not designed to accommodate <br />heavy vehicles, and truck travel on these roads <br />would have the potential to adversely affect the <br />potholes that have file potentia <br />conditions less safe. Roadu <br />Impacted from project truck h <br />to be upgraded to support ve <br />to 25 tons. [9[] • • . [911 • .. [Tl <br />have a significant impact on <br />Ln. <br />eed an <br />was <br />runaway commtions and a comprehensive plan to <br />rehabilitate mid maintain the roadway over a 30 <br />yearperiod. The report identified Kunzler Ranch <br />Rond as being in serious condition and identifies <br />various altemadves for addressing the condition <br />of thercad. "" <br />To mitigate this significant impact, the <br />Draft' -"recommended that Kunzler "Ranch <br />Road be improved as needed (e.g., overlays or <br />reconstruction) per the April 28, 2009 Kunzler <br />Ranch -Road study and die Calhuns Design <br />Manual standards. The project applicant would <br />Pay the full cost of road: improvements, including <br />design and construction. [911 Prior to operations <br />the responsibility to mahitehi the proposed haul <br />roads," .(Italics emitted:) - <br />When it commented on the Draft, the <br />County Department of Transportafion (MDOT) <br />clarified that "Kunzler Ranch Road is not 'a <br />County maintained road and that MDOT has <br />no involvement in its operation, maintenance, <br />or upkeep.... [%] . • . [911 Therefore there <br />is no need for the applicant to enter into a Road <br />Maintenance Agreement with the County for <br />arrangement is the responsibility of the applicant, <br />the mad's owner(s) and those property owners <br />having rights to its use. [11 . • . [9I1 ideally, all <br />the users of Kunzler Ranch Road would voluntarily <br />form: a Road Maintenance Organization for the <br />improvement and. maintenance -of the road. <br />[However,) no party can unilaterally matte this <br />ate Report - 9793 <br />happen...;° <br />The MDOT proposed an alternative means to <br />mitigate the significant impact to Kunzler Ranch <br />Road, and it was adopted nearly verbatim in the <br />EIR The EIR states: 'Traffic,related repairs on <br />Kunzler Ranch Road shall be initiated when the <br />owners of the road and users of the easement <br />reach a decision that such repairs are necessary. <br />Granite's fair share shall be calculated based on <br />the proportion of applicant's heavvyy truck trips to <br />the total nuriber'of heavy truck tri ps on the road <br />dadyear, Consistent with Civil Code Section 845, <br />In the absence of a road maintenance agreement, <br />applicant shall be required to pay its fair share of <br />the cost and expense incurred for trafficrelated <br />repairs of Kunzler Ranch Road,"' - <br />(2} Rdvfew <br />for the Project's impact on <br />'Programs for cumulative 'traffic <br />Of' - Masoulte's' arguments are <br />hg• "IMleasums to mitigate or avoid <br />effects on the environment (runst <br />aforceable through permit conditions, <br />to <br />ul truck traftc. There la'no reason to <br />ae County's commitment to enforce the <br />m measures, <br />Masonite makes a valid point when it <br />will be made or what improvement <br />fimded. The EIR states that the pal <br />to be made when'the interested priv, <br />decide they are necessary or, in `:tl: <br />of an agreement, "[clomistent with <br />section 845;" These provisions leave <br />75B -230 <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.