My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - EIR 1584 SANTA CLARA
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
09/02/2014
>
75B - PH - EIR 1584 SANTA CLARA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2014 4:18:57 PM
Creation date
8/28/2014 3:54:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75B
Date
9/2/2014
Destruction Year
2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
604
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sexlinger Farmhouse and Orchard <br />Residential Development Project <br />CEQA Findings <br />reason that with the reduced intensity of the project, impacts will still be less than <br />significant with mitigation incorporated. (January 2014 EIR Attachment, p. 4.) <br />2. Impact: Would the Project violate any air quality standard or contribute significantly to <br />an existing or projected air quality violation? <br />Finding: Less Than Significant, With Mitigation Incorporated. (EIR, p. 5 -10 through 5 <br />13.) <br />Analysis: SCAQMD has established daily emissions thresholds for several criteria <br />pollutants. While the proposed project will result in unmitigated daily construction <br />emissions below all thresholds for regional significance (EIR, Table 5 -1), and for NOX <br />and CO thresholds for local significance (EIR, Table 5 -3), the proposed project would <br />exceed daily construction thresholds for PM10 and PM2.5. Short-term, unmitigated daily <br />construction impacts will result in PM10 and PM2.5 emissions that exceed the AQMP <br />thresholds for particulate matter. Therefore, this impact is potentially significant. <br />However, with the implementation of the following mitigation measures, particulate <br />matter emissions will be reduced to less than significant: <br />AIR -1: In order to reduce particulate matter emissions during project construction, <br />nontoxic soil stabilizers or comparable dust suppressant shall be applied to all inactive <br />construction areas (previously graded areas inactive for five consecutive days or more). <br />Chemical soil stabilizers, if used, shall be applied according to manufacturer's <br />specifications. <br />AIR -2: In order to reduce particulate matter emissions during construction, exposed <br />surfaces shall be watered three times a day. <br />AIR -4: In order to reduce particulate matter emissions during construction, speeds on <br />unpaved roads will not exceed 15 miles per hour. <br />The incorporation of these measures will reduce PM2.5 and PM10 emissions. This is <br />because chemical stabilizers will reduce dust pick up from inactive graded areas, <br />spraying exposed dirt with water will reduce fugitive dust emissions, and reducing the <br />speed of trucks on unpaved areas will reduce dust kick -up. In total, these measures are <br />expected to reduce PM2.5 emissions from 5.17 pounds per day to 1.55 pounds per day. <br />(EIR, Table 5 -3, compared to Table 5 -5.) As the PM2.5 threshold is 4 pounds per day, <br />PM2.5 would be reduced to a level of less than significant, with incorporation of the <br />above mitigation measures. Similarly, emissions of PM10 would be reduced from 21.08 <br />pounds per day, to 3.74 pounds per day. As the PM10 threshold is 6 pounds per day, <br />PM10 would be reduced to a level of less than significant with incorporation of the above <br />mitigation measures. (EIR, Table 5 -3, compared to Table 5 -5.) Given that the project <br />proposal analyzed in the Draft FIR included development of 24 new single family <br />residences, and the project as approved will include development of only 22 new single <br />family residences, it stands to reason that with the reduced intensity of the project, <br />7 53570 "Exhibit A" <br />
The URL can be used to link to this page
Your browser does not support the video tag.