My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH - EIR 1584 E SANTA CLARA AVE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
09/16/2014
>
75A - PH - EIR 1584 E SANTA CLARA AVE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2014 3:43:48 PM
Creation date
9/11/2014 2:21:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
9/16/2014
Destruction Year
2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
604
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KOA CORPORATION <br />PLANNING & ENGINEERING <br />TECHNICAL MEMORANDUM <br />Date: July 18, 2013 <br />To: Mr. Robert Odle <br />Odle Associates <br />From: Min Zhou, P.E:; Vice President — KOA 'Corporation <br />Subject: Traffic Engineering Services for the TAVA Homes Project in the City of Santa Ana <br />Introduction <br />KOA Corporation (KOA) is pleased to submit this traffic analysis of a proposed site plan change for the TAVA <br />Homes project in the City of Santa Ana. The purpose of the analysis is to evaluate the expected effect of closing <br />the south entrance of the project to public access. The south entrance would have a "crash gate" slily, allowing <br />only emergency vehicle access. The analysis will consider the effect this change may have on Santa Clara Avenue <br />and Wright Street, and reconsider recommendatlons for improvements to the Santa Clara Avenue /Wright Street <br />Intersection. <br />Background <br />A traffic impact study was completed for the TAVA Homes project by KOA in 2011. This study analyzed the <br />traffic volumes expected to be generated by the proposed 24 -unit residential project as well as their expected <br />impacts to the surrounding roadway network. Access to the development was provided on Santa Clara Avenue <br />on the north side of the project site and at Avalon Avenue on the south side of the project site. Eighty -five <br />percent of project traffic was presumed to access the site via the north entrance, and fifteen ,percent was <br />presumed to access the site via the south entrance, <br />The 2011 study determined that the project would generate 230 net daily trips, including 18 AM pear hour trips <br />and 24 PM peak hour trips. The study also determined that added traffic from the proposed project would result <br />In a significant' impact to one intersection, Santa Clara Avenue at Wright Street, Mitigation measures designed to <br />mitigate this impact were recommended. The recommended measures were a traffic signal, roundabout, or wide <br />2 -way left-turn lane. Additional background information can be found in the report "Traffic Impact Study for the <br />TAVA Homes project at 1$84 East Santa Clara Avenue in the City of Santa Ana ", March 14, 2011, by KOA <br />Corporation. <br />Project Description <br />The proposed project description based on the revised site plan includes 24 single - family dwelling units on an <br />approximately 5-acre site. The project site 'Is located at 1584 East Santa Clara Avenue, east of Wright Street, and <br />75A -281 <br />
The URL can be used to link to this page
Your browser does not support the video tag.