Laserfiche WebLink
L <br />commundytaspUad$paces MW <br />FeeP o aI .8 GROUP <br />r l�� J4 1 GROUP <br />'L <br />It is the objective of our Design Team to provide the most comprehensive, yet efficient, approach to the <br />development of the Pacific Electric Park project. Fees for the enclosed scope of work are as follows: <br />Ii a'3C+ <br />TASK 1 Pre - Design Meeting / Project Start -Up $ 3,500.00 <br />TASK Design Development $ 40,400.00 <br />TASKS Construction Documents $ 1.35,500.00 <br />TASK Bidding,,,,.__.._.Q(jQQ <br />Total Task 1 -4: $ 185,900,00 <br />Estimated Reimbursable Allowance; ,$. 000 QQ <br />Total Fee *: U .95,9Ikl.flff <br />*Note: This fee. summary represents our current understanding of the Pacific Electric Park project scope and <br />complexity and an estimated construction budget of $2.3 M as indicated by the preliminary construction <br />cost estimate provided in the RFP attachment. The indicated fee is based on the preparation of a single <br />construction document bid package, Our scope of work and fee may be subject to adjustment If the City's <br />construction budget is modified or if the project Is to be designed in phases. Fee adjustments, If any, shall be <br />documented by addendum to this Agreement, <br />All reimbursable costs including printing, plotting, reproduction, photo and delivery will be billed to the <br />City in addition to the basic fee at cost plus 15%. <br />Professional services not specifically identified in the scope of work will be considered additional services <br />and maybe performed at Client's request, reimbursable at Consultant's standard hourly rates, Additional <br />services may include, but are not limited to, <br />• Additional meetings, presentations, or site visits beyond those identified in the scope of work. <br />• Exhibit preparation beyond that identified in the scope of work. <br />• Revisions to documents required as a result of changes in Client's direction and /or subsequent to <br />Client's approval, or changes In governmental regulations, <br />• Design of Improvements beyond the designated project site, or due to changes in project phasing <br />schedule. <br />• Engagement of other consultants not specifically identified below, <br />SAN JUAN CAPISTRANO -SACRAMENTO <br />wwa.RJM WO11gwup.com • [9491493.2600 <br />25D -60 <br />