Laserfiche WebLink
a; <br />ae <br />F <br />�a <br />;g <br />Fee Proposal <br />y.. <br />comnlun @Y Inspired 5Y/aCSS ., <br />GROUP <br />SIG <br />MCG CONSULTANTS <br />_ __� <br />PRINCIPAL <br />$184.00 per hour <br />PROJECT MANAGER <br />$138.00 per hour <br />PROJECT ENGINEER <br />$11500 per hour <br />PROJECT SURVEYOR <br />$1.38,00 per hour <br />DESIGN ENGINEER <br />$103.50 per hour <br />COMPUTER DRAFTSPERSON <br />$ 80.50 per hour <br />PROJECT ASSISTANT <br />$ 57.50 per hour <br />3 -MAN SURVEY CREW <br />$32200 per hour <br />2 -MAN SURVEY CREW <br />$264.50 per hour <br />EXPERT WITNESS (TRIAL AND DEPOSITION) <br />$287.50 per hour <br />AOS CONSUL'TING1 NCTJI <br />PRINCIPAL <br />$172,50 per hour <br />PROJECT ENGINEER <br />$155,25 perhour <br />CARD OPERATOR/ DRAFTER <br />$109.25 per hour <br />TECHNICAL TYPING AND REPRODUCTION <br />$97.75 per hour <br />SITE VISIT <br />$155.25 per hour <br />Billings for all time and materials and contract extension work shall be in accordance with the level of work <br />performed and will be broken into the categories listed above. <br />Fees will be escalated each August 1st in accordance with any increase in the Consumer's Price Index or <br />other mutually agreed upon cost index beginning with August 1, 201.5. <br />All provisions for escalations stated, pertain to all contract extension and additional work, <br />25D -62 <br />SAN JOAN OAPIS FRANO - SACRAMENTO <br />www.QJMdoOOnp up,oum - (949) 498.2600 <br />