My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2014-09-16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
09/16/2014
>
FULL PACKET_2014-09-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2014 10:21:14 AM
Creation date
9/11/2014 6:38:16 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
9/16/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1782
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Design and <br />Economic Feasibility <br />(Per Section 7.1) <br />Conduct of Phase I <br />and Phase II (Per <br />Section 7.6) <br />Conduct structural <br />engineering and <br />earthquake safety <br />retrofit (Per Section <br />EXHIBIT "C" <br />DEVELOPER will conduct a design and economic feasibility <br />study relating to the Prject. DEVELOPER, The CITY and The <br />Developer and CITY's consultants will evaluate the design and economic <br />The CITY feasibility of the Project based on, among other things the <br />design and economic feasibility study undertaken by <br />DEVELOPER. <br />DEVELOPER will be permitted to undertake a Phase I <br />DEVELOPER Environmental Analysis and /or Phase II Environmental <br />analysis, each at Developer's sole cost and expense. <br />As part of the development of the Project, DEVELOPER will <br />DEVELOPER be required to undertake certain structural engineering and <br />earthquake safety retrofits. <br />DEVELOPER will conduct any California <br />Environmental Quality Act (CEQA) Review required by law and prepare any <br />Review (Per Section Developer Environmental Impact Reports required by law. CITY agrees <br />7 6) to work cooperatively with DEVELOPER during any CEQA <br />Review or the preparation of any Environmental Impact <br />25C -26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.