Laserfiche WebLink
responsible for and shall certify the accuracy of measurements <br />from the metering devices. <br />6.2: OCWD agrees to properly and regularly operate, <br />maintain, replace as necessary, and inspect the facilities <br />comprising the Project in accordance with all applicable State <br />and Federal laws, rules, regulations and guidelines for the <br />term of this Agreement; provided, however, that OCWD may <br />contract with local retail water purveyors for the maintenance, <br />repair, replacement and inspection of those portions of the <br />Project facilities that are within the service areas of such <br />local retail water purveyors. <br />6.3:, OCWD shall, at all times during the term of this <br />Agreement, use its best efforts to operate the Project <br />facilities, upon completion of construction, in accordance with <br />the highest professional standards and generally accepted <br />maintenance and operation principles, and in such manner as to <br />provide service to existing and (to the extent that Project <br />facility capacity and Actual Yield is available) to future End <br />Users on a fair and equitable basis. <br />6.4: OCWD shall provide sufficient qualified <br />personnel to properly operate and maintain the Project <br />facilities. such personnel shall, no later than the <br />commencement of deliveries of Reclaimed Water from the Project, <br />meet applicable certification requirements of the State Water <br />Resources Control Board, and other pertinent regulatory <br />agencies as required. <br />