My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RMC WATER AND ENVIRONMENT, INC. - 2014
Clerk
>
Contracts / Agreements
>
R
>
RMC WATER AND ENVIRONMENT, INC. - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 4:54:59 PM
Creation date
10/3/2014 3:51:11 PM
Metadata
Fields
Template:
Contracts
Company Name
RMC WATER AND ENVIRONMENT, INC.
Contract #
A-2014-187
Agency
PUBLIC WORKS
Council Approval Date
8/5/2014
Expiration Date
6/30/2017
Insurance Exp Date
10/14/2016
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Objective: City desires to update the 2003 Sewer Master Plan to reflect subsequent <br />growthlohanges in City's General Plan; reflect subsequent sewer improvements., and include <br />the most recent CCTV inspections and Entranced Maintenance' Locations. The Update shall <br />analyze the age of the sewer infrastructure; and the capacity of the City's Sewer Collection <br />System for existing and future peak flow conditions under both dry and wet weather conditions. <br />In addition, the Update shall include the summary of the rankings of the condition of the sewer <br />pipes /manholes and the recommended rehabilitation and replacement of these sewers based on <br />the most recent CCTV inspection reports. <br />A Capital Improvement Program shall be developed to address identified hydraulic capacity <br />deficiencies and structural deficiencies that are a risk of collapse or prone to more frequent <br />blockages due to pipe defects. The "hydraulic model delivered shall be turn -key and shall be <br />delivered within a GIS- complaint format that the City can access, maintain and continue to <br />operate in -house in the future. The primary focus of the update is to evaluate the collections <br />system overall conditions and to provide new tools and methods empowering the City staff to <br />perform duties more effectively, and efficiently, The Sewer Master Plan Update will not need to <br />include the analysis of the existing lift stations. <br />Background: The City last performed a Sewer Master Plan in 2003. The two main objectives of <br />the 2003 Sewer System Master Plan, prepared by MW Fl, were to: assess the hydraulic capacity <br />of major sewers and lilt stations with a dynamic computer model; and proactively identify <br />required improvements to ensure adequate capacity for current and projected future wastewater <br />flows; and perform a study to determine the extent of infiltration /inflow (I /I) of groundwater and <br />storm water into the City's sewers, and recommend appropriate actions to address any identified <br />1/1 problems. The City does not have a copy of the final model software or the <br />corresponding data input/output files. The City only has hard copies of the Final Sewer <br />Master Plan. <br />The City has experienced some growth /changes to the City's General Plan since the last sewer <br />master plan in 2003. Some of these changes include the Harbor Specific Plan, the Transit Zone <br />Plan and several District Specific Zone modifications. Several of the Priority I Projects; included <br />in The 2003 Sewer Master Plan have been constructed. In addition, the City has implemented a <br />sewer lining program by which more than 55,000 feet of main sewer lines have been lined. <br />Since 2003, the City has also prepared the Sewer System Management Plan (SSMP) dated 2009' <br />and the 2013 Sewer System Management Plan Internal Audit. In addition, the City in 2004 <br />adopted =a comprehensive Pats, Oils, and Grease (FOG) control program. Along with these <br />addition plans and programs, the City has been performing a system -wide video inspection every <br />eight years, which was last completed in 2010. The City has also updated the enhanced <br />maintenance locations (EMLs) as part of its implementation of the 2009 SSMP, The existing <br />2003 Seiner Master Plan needs to be updated to address these changes and additional <br />information; <br />Data Available from the City. The City does not have a copy of the final sewer hydraulic <br />model or the corresponding data riles. It only has hard copies of the Final Sewer Master Plan <br />report. The City has developed a comprehensive sewer map in GIS format that shows all gravity <br />line segments, manholes, and lift stations which complies with a geometric network. The Sewer <br />
The URL can be used to link to this page
Your browser does not support the video tag.