Laserfiche WebLink
Exhibit )3 -1 <br />WELL & <br />PUMP REMOVAL / INSTALLATION SERVICES (A) <br />DESCRIPTION UNIT.,, <br />1A MOBILIZATION (pervehlcle /crew) LS <br />2A PUMP RIG & CREW HR <br />3A 12 -TON HYDROCRANE & <br />CREW LS <br />4A DEMOBILIATION (per vehicle /crew) LS <br />NON - PREVAILING <br />$ 300.00 <br />$ 275.00 <br />:i oe <br />$ 300.00 <br />WELL /PUMP REPAIR SERVICE (B) <br />PREVAILING <br />$ 300.00 <br />$ 350.00 <br />$ 300.00 <br />$ 300.00 <br />DESCRIPTION <br />UNIT <br />RATE <br />I GENERAL SHOP LABOR <br />HR <br />$ <br />55.00 <br />2B MACHINE SHOP REPAIR <br />HR <br />$ <br />75.00 <br />3B SHOP WELDING <br />HR <br />$ <br />80.00 <br />4B ON -SITE MECHANICAL <br />REPAIRS & INSPECTIONS <br />(DURING BUS. HOURS) <br />HR <br />$ <br />125.00 <br />5B ON -SITE EMERGENCY <br />MECHANICAL REPAIRS (AFTER <br />BUS. HOURS) <br />HR <br />$ <br />200.00 <br />6B WELL VIDEO SURVEY <br />EA <br />$ <br />1,100.00 <br />NON - PREVAILING <br />PREVAILING <br />7B WELL REHAB (SCRATCH & <br />BAIL) HR $ 250.00 $ 350,00 <br />ALL HOURS OVER BHOURS @ TIME & A HALF <br />SATURDAY RATES @ TIME & A HALF <br />SUNDAY & HOLIDAY RATES @ DOUBLE TIME <br />AS NEEDED PARTS AND MATERIAL WILL BE MARKED UP 15/0 <br />PRICES VALID UNTIL 12/31/2014 <br />Ruben Baltlerra <br />Estimator / Project Manager <br />