Laserfiche WebLink
CRAFT STRAIGHT OVER DOUBLE <br />CRAFTSMAN /CLASS <br />CODE <br />TIME <br />TIME <br />TIME <br />CARPENTERS <br />CODE <br />TIME <br />TIME <br />TIME <br />General Foreman <br />CAGF <br />90.10 <br />123.76 <br />157.42 <br />Foreman <br />CAFM <br />86.88 <br />119.02 <br />151.16 <br />' Journeyman <br />CAJM <br />82.05 <br />111.91 <br />141.77 <br />Apprentice -8th Period (90%) <br />CAA8 <br />76.72 <br />102.60 <br />129.48 <br />CEMENTMASONS. <br />PEG3 <br />78.18 <br />104.92 <br />131.66 <br />Foreman <br />CMFM <br />84.75 <br />111.23 <br />137.71 <br />Journeyman Commercial <br />CMJC <br />79,92 <br />104.12 <br />128.33 <br />Journeyman Light Commercial <br />CMJL <br />72.34 <br />94.30 <br />116.25 <br />F &T Machine Operator <br />CMFT <br />80.32 <br />104.71 <br />129.11 <br />Apprentice - 8th 6 Mos. (90 %) <br />CMA8 <br />74.79 <br />96.57 <br />118.36 <br />..LABORERS <br />General Foreman <br />LAGF <br />81.67 <br />108.72 <br />13576 <br />Foreman <br />LAFM <br />80.06 <br />106.35` <br />132.63 <br />Group i - General <br />LAG1 <br />72.98 <br />95.92 <br />118.86 <br />Group 2 -Chute Man <br />LAG2 <br />73.87 <br />97.22 <br />120.58 <br />Group 3 - Pipeline Backup Man <br />LAG3 <br />74.75 <br />98.53 <br />122.30 <br />Group 4 - Pipe Layer, C &S <br />LAG4 <br />77.25 <br />102.20 <br />127.16 <br />Group 5 - Blaster I Driller <br />LAGS <br />77.81 <br />103.03 <br />128.25 <br />Apprentice - 6th Period (85 %) <br />LAA6 <br />59.11 <br />80.54 <br />101.98 <br />OPERATING ENGINEERS <br />100.93 <br />133.31 <br />165,68 <br />Metal Trades <br />General Foreman, Appdx. A <br />OEGF <br />105.43 <br />141.10 <br />176.76 <br />Foreman, Appdx. A <br />OEFM <br />10221 <br />136.36 <br />170.51 <br />Group 1, Appdx. A - Oiler <br />OEG11 <br />94.33 <br />124.77 <br />155.20 <br />Group 2, Appdx. A - Oiler <br />OEG2 <br />95.59 <br />126.62 <br />157.64 <br />- Group 8, Appdx. A - Universal <br />OEG8 <br />98.99 <br />131.62 <br />16425 <br />Group 10, Appdx. A - Mechanic <br />OEGM <br />99.18 <br />131.90 <br />164.62 <br />Group ^8, Appdx. B - Crane (up to 2! <br />OEBB <br />99.45 <br />132.30 <br />165.15 <br />Group 9, Appdx. B - Crane (25 to I <br />OEB9 <br />99.73 <br />132.71 <br />165.69 <br />Apprentice, GR 8, Appdx A - 6th (£ <br />OEA6 <br />92.07 <br />121.44 <br />150.81 <br />Apprentice Rates: Apprentice rates listed above are for the highest classification prior to journeyman full scale rates,: Billing for apprentices will be based on actual <br />classification(s) noticed. <br />Boundaries of Southern California Cost Plus Rates: Consist of the eleven (11) counties of Los Angeles, Inyo, Mono, Orange, Riverside, San Bernardino, Imperial, <br />Ventura, Santa Barbara, San Luis Oblspo, Kern and in addition: Richardson Rock, Santa Cruz Island, Arch Rock, San Nicholas Island, Catalina Island, San Clemente <br />Island, San Miguel Island, Santa Barbara Island, Santa Rosa Island, Anacapa Island, Including the Channel Islands Monument. Rate Scale does not include San Diego <br />County. <br />Markup: Material, subcontractors, subsistence, outside rentals (Including fuel costs) etc., will be billed cost, plus sales tax as applicable, plus mark -up of 15 %. <br />Overtime Rates: Shift(s) shall be paid per union agreements). <br />Subalstence: Lodging & masts for management, superintendents & general foramen will be billed at actual costs, plus mark -up at 15% <br />Travel Time: Billing time will start once employees are dispatched and end upon their return to the company facility,. <br />USA Notification: Client Is responsible for Underground Service Alert (USA) notification for all emergency work. <br />NOTE: All wage scales presented herein are subject to change without notice. This document does not include all labor classificatlons. Additional labor classifications are <br />available upon request. Some work areas may be subject to special wage agreements, If applicable, fees will be billed accordingly. <br />(Rev) 07/30/14 <br />4150 Long Beach Boulevard, Long Beach, CA 90807 - 562 - 928 -6111 - fax: 562 - 928 -7339 - www,warasic.corn <br />state contractor's license #A368761 <br />CRAFT <br />STRAIGHT <br />OVER <br />DOUBLE <br />CRAFTSMAN /CLASS <br />CODE <br />TIME <br />TIME <br />TIME <br />PROJECT MANAGEMENT <br />Project Administrator <br />PADM <br />52.74 <br />67.85 <br />82,96 <br />Project Engineer 1 <br />PEG1 <br />68.60 <br />91.08 <br />113.57 <br />Project Engineer 2 <br />PEG2 <br />73.65 <br />95.66 <br />117.68 <br />Project Engineer 3 <br />PEG3 <br />78.18 <br />104.92 <br />131.66 <br />Project Engineer 4 <br />PEG4 <br />87.38 <br />118.34 <br />149.30 <br />Superintendent <br />PMSP <br />118.67 <br />157.52 <br />184.08 <br />Assistant Project Manager <br />PMAS <br />110.85 <br />150.36 <br />189.87 <br />Project Manager <br />PMPM <br />126.31 <br />172.30 <br />218.28 <br />Senior Project Manager <br />PMSR <br />157.24 <br />215.99 <br />274.73 <br />.TEAMSTERS. <br />Foreman <br />TDFM <br />78.89 <br />101.68 <br />124.47 <br />GR 2 - 2 Axle <br />TOG2 <br />75.91 <br />97.30 <br />118.68 <br />GR 3 - 3 Axle <br />TDG3 <br />76.12 <br />97.61 <br />119.09 <br />GR 5 - Working Truck Driver <br />TDG5 <br />76.48 <br />98 -13 <br />119.78 <br />GR 6 -4 or More Axle <br />TDG6 <br />76.53 <br />98.20 <br />119.87 <br />Sub Journeyman -4001 -6000 Hrs,, <br />TDA3 <br />58.54 <br />7237 <br />86.20 <br />WELDERS/FITTERSIHLP - Local 250 Shortline <br />Foreman <br />WLFM <br />107.39 <br />142.57 <br />177.76 <br />Journeyman <br />WLJM <br />100.93 <br />133.31 <br />165,68 <br />Metal Trades <br />WLMT <br />59.81 <br />75.86 <br />91.91 <br />WELDERS /FITTERS /HLP - Local 250 Industrial <br />Foreman <br />IW2F <br />110.03 <br />148.99 <br />185.41 <br />Journeyman <br />IW2J <br />99.47 <br />133.44 <br />165.11 <br />Apprentice Fifth Year <br />IWA5 <br />78.62 <br />106.03 <br />131.37 <br />Apprentice Rates: Apprentice rates listed above are for the highest classification prior to journeyman full scale rates,: Billing for apprentices will be based on actual <br />classification(s) noticed. <br />Boundaries of Southern California Cost Plus Rates: Consist of the eleven (11) counties of Los Angeles, Inyo, Mono, Orange, Riverside, San Bernardino, Imperial, <br />Ventura, Santa Barbara, San Luis Oblspo, Kern and in addition: Richardson Rock, Santa Cruz Island, Arch Rock, San Nicholas Island, Catalina Island, San Clemente <br />Island, San Miguel Island, Santa Barbara Island, Santa Rosa Island, Anacapa Island, Including the Channel Islands Monument. Rate Scale does not include San Diego <br />County. <br />Markup: Material, subcontractors, subsistence, outside rentals (Including fuel costs) etc., will be billed cost, plus sales tax as applicable, plus mark -up of 15 %. <br />Overtime Rates: Shift(s) shall be paid per union agreements). <br />Subalstence: Lodging & masts for management, superintendents & general foramen will be billed at actual costs, plus mark -up at 15% <br />Travel Time: Billing time will start once employees are dispatched and end upon their return to the company facility,. <br />USA Notification: Client Is responsible for Underground Service Alert (USA) notification for all emergency work. <br />NOTE: All wage scales presented herein are subject to change without notice. This document does not include all labor classificatlons. Additional labor classifications are <br />available upon request. Some work areas may be subject to special wage agreements, If applicable, fees will be billed accordingly. <br />(Rev) 07/30/14 <br />4150 Long Beach Boulevard, Long Beach, CA 90807 - 562 - 928 -6111 - fax: 562 - 928 -7339 - www,warasic.corn <br />state contractor's license #A368761 <br />