Laserfiche WebLink
City of Santa Ana, CA I SEWER RATE STUDY <br />These inspection and replacement assignments were then adjusted over a five year plan to moderate <br />annual budgeting expenditures. Total inspection and replacement percentages follow those of the <br />strategy group recommendations. Table C 4 below presents initial annual inspection and replacement <br />assumption plans. The inspection plan percentage values indicate the percent of uninspected pipes that <br />remain to be inspected at that time. It assumes that all pipe segments have already been recently <br />inspected or will be under this inspection program. Percentages are the suggested replacement <br />quantities as presented in the R &R summarizations and recommendations table presented above. <br />Table C -4: Annual Inspection and Replacement Assumption Plans <br />- percentages shown are total inspected to date <br />L 0?� 300 O.e 0.0'c <br />00-, 0.01 100.09: <br />B 0.0% I 0.0% ? 100.0% i 0.0% OA% 100.0 +:: <br />C 0.0% <br />0.1 0.0% a 30.0% 0.0% 30.05; <br />D 10.0% 10.0% ) 0% £ 10.0% 10.0% 50.0% <br />I 10._ <br />E 2.0% 1.0 % <br />1.0% 1.0% S.0% 10.0% <br />F 1.0% 0.0% 2.0% , 1.0% 1.0% 5.0% <br />0.5% 0.5% os% 05% 0.5% MIA <br />H 0.2% 0.2% 0.2% f 0.2% 0.2% 1.0% <br />z 0.0% 0.0% 0.0% 0.0% 0.0% 1 <br />Based on the above assumption plan, an annual inspection and replacement budget was developed. <br />Table C 5 presents the resulting annual budget. Figure C 5 presents these results graphically. The overall <br />assumption plans can be adjusted to create a variety of budgeting scenarios. Note, the City may wish to <br />also include a nominal annual budget for ongoing inspections to address system -wide pipe segments not <br />included in this suggested plan. <br />Table C - 5: Annual Inspection and Replacement Budget Table <br />Year Inspect Replace Total Cum Total <br />Yearl $916,388 $1,911,299 $2,682,147 $2,682,147 <br />Year2 $89,756 $3,026,311 $3,143,122 $5,825,270 <br />Year3 $0 $2,820,191 $2,918,041 $8,743,311 <br />Year4 $0 $3,190,619 $3,211,252 $11,954,563 <br />Years $0 $2,689,157 $2,689,157 $14,643,720 <br />Total $1,006,144 $13,637,576 $14,643,720 <br />BLACK & VEATCH I Appendix C Inspection and Replacement Cost .akz3lanon <br />65B -276 <br />100.0% 0 <br />0.0% [ o <br />o o% j 0 <br />0.0% 0 <br />0 -0% 1 <br />100.0% <br />B 1 <br />1000% 0 <br />0.0% 0 <br />0.0% r 0 <br />0.0% 0 <br />0.0% 1 <br />100.0% ,. <br />c 1 <br />1000% o <br />o.o% 0 <br />0.0% o <br />o.o% o <br />o.o% 3 <br />300.0% <br />0 0 <br />0.0% i <br />i 100.0% 0 <br />0.0% 0 <br />0.0% 0 <br />0.0% 1 <br />100.0% <br />E 0 <br />0.0% 1 <br />1000% 0 <br />0.0% 1 0 <br />0.0% 0 <br />0.0% 1 <br />100.0% <br />F 1 <br />100.0% 1 <br />1 0 <br />0.0% 0 <br />0.0% 0 <br />0.0% 1 <br />100.0% <br />100.0%_.. l <br />l 0% 1 <br />1 - 0 <br />0.0% 0 <br />0.096 1 <br />100.0% <br />H 1 <br />100.0% 0 <br />0.0% 0 <br />0.0% 0 <br />0.0% O <br />OA% _ <br />_ 100.0% <br />z o <br />oo % 0 <br />0.0% 0 <br />0.0% 0 <br />0.0% 0 <br />0.0% 1 <br />1 ' <br />00-, 0.01 100.09: <br />B 0.0% I 0.0% ? 100.0% i 0.0% OA% 100.0 +:: <br />C 0.0% <br />0.1 0.0% a 30.0% 0.0% 30.05; <br />D 10.0% 10.0% ) 0% £ 10.0% 10.0% 50.0% <br />I 10._ <br />E 2.0% 1.0 % <br />1.0% 1.0% S.0% 10.0% <br />F 1.0% 0.0% 2.0% , 1.0% 1.0% 5.0% <br />0.5% 0.5% os% 05% 0.5% MIA <br />H 0.2% 0.2% 0.2% f 0.2% 0.2% 1.0% <br />z 0.0% 0.0% 0.0% 0.0% 0.0% 1 <br />Based on the above assumption plan, an annual inspection and replacement budget was developed. <br />Table C 5 presents the resulting annual budget. Figure C 5 presents these results graphically. The overall <br />assumption plans can be adjusted to create a variety of budgeting scenarios. Note, the City may wish to <br />also include a nominal annual budget for ongoing inspections to address system -wide pipe segments not <br />included in this suggested plan. <br />Table C - 5: Annual Inspection and Replacement Budget Table <br />Year Inspect Replace Total Cum Total <br />Yearl $916,388 $1,911,299 $2,682,147 $2,682,147 <br />Year2 $89,756 $3,026,311 $3,143,122 $5,825,270 <br />Year3 $0 $2,820,191 $2,918,041 $8,743,311 <br />Year4 $0 $3,190,619 $3,211,252 $11,954,563 <br />Years $0 $2,689,157 $2,689,157 $14,643,720 <br />Total $1,006,144 $13,637,576 $14,643,720 <br />BLACK & VEATCH I Appendix C Inspection and Replacement Cost .akz3lanon <br />65B -276 <br />Based on the above assumption plan, an annual inspection and replacement budget was developed. <br />Table C 5 presents the resulting annual budget. Figure C 5 presents these results graphically. The overall <br />assumption plans can be adjusted to create a variety of budgeting scenarios. Note, the City may wish to <br />also include a nominal annual budget for ongoing inspections to address system -wide pipe segments not <br />included in this suggested plan. <br />Table C - 5: Annual Inspection and Replacement Budget Table <br />Year Inspect Replace Total Cum Total <br />Yearl $916,388 $1,911,299 $2,682,147 $2,682,147 <br />Year2 $89,756 $3,026,311 $3,143,122 $5,825,270 <br />Year3 $0 $2,820,191 $2,918,041 $8,743,311 <br />Year4 $0 $3,190,619 $3,211,252 $11,954,563 <br />Years $0 $2,689,157 $2,689,157 $14,643,720 <br />Total $1,006,144 $13,637,576 $14,643,720 <br />BLACK & VEATCH I Appendix C Inspection and Replacement Cost .akz3lanon <br />65B -276 <br />BLACK & VEATCH I Appendix C Inspection and Replacement Cost .akz3lanon <br />65B -276 <br />