My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - DELHI DIVERSION PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/16/2014
>
25F - AGMT - DELHI DIVERSION PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2014 4:17:06 PM
Creation date
12/11/2014 4:08:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
12/16/2014
Destruction Year
2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Preliminary Design Report Addendum No.2 <br />3.5 SEDIMENTATION AND DISCHARGE STORAGE CHAMBER <br />The discharge storage chamber will provide approximately 140,000 gallons of storage for further <br />sediment particles and storage volume to be pumped either to the surface reservoir located within the golf <br />course or pumped directly into the sanitary sewer system for final treatment and disposal. <br />The discharge storage chamber will consist of a 60,000 gallon concrete chamber followed by four precast <br />reinforced concrete underground storage chambers, each with a dimension of 7' -8" by 14' by 50'. The <br />RCB storage tank will provide an additional storage capacity of 80,000 gallons for dry- weather <br />conditions. During the wet - weather condition, the water level in the storage chamber will be <br />approximately 2 feet higher than the dry- weather condition, and will provide an effective storage volume <br />of 75,000 gallon (for HRT calculation) and a total storage of 175,000 gallons. The calculated hydraulic <br />retention time for the dry- weather conditions is 13 hours, which is conservative compared to a typical 28 <br />hour sedimentation chamber design. The short HRT during maximum design flow conditions (100 cfs) <br />indicates that sedimentation will not likely be effective during the high flow event. This suggests that the <br />cleaning of sedimentation from dry- weather conditions should take place prior to the rainy season, to <br />avoid flushing the sediments in the storage chamber. <br />Table 3- 3 Sedimentation and Discharge Storage Chamber Design <br />3.6 PUMP STATION <br />URS understands that the underlying land owner of the golf course has expressed concerns regarding <br />water quality and its suitability for irrigation. If the golf course accepts the water quality for irrigation, a <br />single pump station with proper control and a single motorized three -way control valve on the pump <br />discharge pipeline will be able to deliver the harvested water to the golf course reservoir during the hours <br />of 5:00 am to 12:00 pm. The pump on -off control will be based on levels in the receiving reservoir and <br />the pump station wet well. The pump station will pump the harvested water to the sewer system during <br />the hours of 12:00 pm to 5:00 am through the adjacent CMSD sewer connection. If the captured dry - <br />weather flow can not be reused for golf course irrigation, alternatively it can be pumped continuously to <br />the OCSD trunk main connections. <br />The pump station will be a typical duplex station, each with a 300 gpm capacity submersible pump. The <br />pump head varies for different pipe routing options and discharge points between 20 feet to 80 feet <br />dynamic head. More details are provided in Section 4. <br />LW 10 <br />25F -142 <br />Total Stora a <br />Effective Volume <br />HRT <br />Dry- weather Condition <br />1 140,000 gallon <br />140,000 gallon <br />13 hours <br />Maximum Flow Condition <br />1 175,000 gallon <br />75,000 gallon <br />1.7 minutes <br />3.6 PUMP STATION <br />URS understands that the underlying land owner of the golf course has expressed concerns regarding <br />water quality and its suitability for irrigation. If the golf course accepts the water quality for irrigation, a <br />single pump station with proper control and a single motorized three -way control valve on the pump <br />discharge pipeline will be able to deliver the harvested water to the golf course reservoir during the hours <br />of 5:00 am to 12:00 pm. The pump on -off control will be based on levels in the receiving reservoir and <br />the pump station wet well. The pump station will pump the harvested water to the sewer system during <br />the hours of 12:00 pm to 5:00 am through the adjacent CMSD sewer connection. If the captured dry - <br />weather flow can not be reused for golf course irrigation, alternatively it can be pumped continuously to <br />the OCSD trunk main connections. <br />The pump station will be a typical duplex station, each with a 300 gpm capacity submersible pump. The <br />pump head varies for different pipe routing options and discharge points between 20 feet to 80 feet <br />dynamic head. More details are provided in Section 4. <br />LW 10 <br />25F -142 <br />
The URL can be used to link to this page
Your browser does not support the video tag.