Laserfiche WebLink
Tariq Hussain, R.E.A. <br />vapor extraction system was installed at the site. The installed system has <br />been successfully operated for over one year and is meeting or exceeding <br />all project objectives. <br />Project Manages, Comprehensive Long -term Environmental Action Navy <br />(CLEAN) Program, Various Cities in Southern California, CA, Naval and <br />Marine Corps: This program, which is one of the largest DOD hazardous <br />waste management contracts to date, covers most of the Naval and <br />Marine Corps bases between Los Angeles and San Diego to the south and <br />the New Mexico border to the east. Projects include contamination <br />assessment, UST removal and site closure, site investigation, removal <br />action, solid waste assessment, design of soil and groundwater <br />remediation processes, and identification and evaluation of appropriate <br />technologies for soil and ground -water remediation. <br />Project Manager, Superfund Sites Study, Various Cities, U.S., Chevron: <br />Conducted a study of 30 Superfund sites nationwide and evaluated each <br />site in terms of Potentially Responsible Party participation, community <br />concerns, treatment technology selection process, implementation of the <br />remediation plan, agency reactions, and cost - analysis per ton of treated <br />waste. The purpose of the study that was conducted for Chevron was to <br />show trends in the Superfund process leading to site remediation. The <br />influence of each criterion on the remedy selection process was evaluated. <br />Project Manager, Industrial Site Feasibility Study, San Diego County, CA: <br />Responsible for the industrial site, which had groundwater contaminated <br />with halogenated solvents. Conducted a feasibility study and designed a <br />remediation system using a pump and treat system. The design included <br />the use of computer models to locate the optimum location of extraction <br />and injection wells. Evaluated different technologies, including carbon <br />absorption, air stripping, and peroxidation for treating contaminated <br />water. This remediation plan was approved by the San Diego Regional <br />Water Quality Control Board and implemented. <br />Project Manager, Hazardous Waste Minimization Study and Audit, San <br />Diego, CA, San Diego Gas &Electric: Completed a hazardous waste <br />minimization study, and audit for SDG &E facilities. Installation included <br />power plants, gas pipeline booster stations, service centers, and vehicle <br />maintenance shops. Also evaluated SDG &E's compliance with <br />California's SB -14 regulation. The project led to a comprehensive <br />understanding of the SDG &E operations. <br />Project Manager, RMPP Project /Fault Tree Analysis, San Bernardino <br />County, CA, San Bernardino County Health Department: Responsible for <br />an RMPP project involving handling and storing ammonia, chlorine, <br />sulfuric acid, nitric acid, and TDI. A Hazop study was conducted for the <br />equipment forming part of each chemical operation. In addition, a Fault <br />Tree Analysis was conducted using a maximum of two successive faults <br />that could lead to a release from the facility. The scenarios selected for <br />off -site consequence analysis were derived from the Fault Tree Analysis. <br />25F -73 <br />