Laserfiche WebLink
Mr. del Castillo has over 47 years of experience in managing both field and office operations for all phases of <br />surveying and mapping services. He has managed 30 "On -Call' contracts directly for the support of many <br />federal, state, and local agencies. These contracts include the Counties of Los Angeles and Orange, the U.S. <br />Forest Service, various U,S. Army Corps of Engineer Districts, the U.S. Navy - Southwest Division, and the <br />Los Angeles County Metropolitan Water District (MWD). <br />He has a "hands -on" working knowledge of various land surveying services, including Right -of -Way and <br />boundary surveys and analysis, GPS surveys, topographic surveys, utility location surveys, large -scale aerial, <br />and geodetic control and monitoring quantities. While working directly for the County of Orange, Mr. del <br />Castillo was responsible for all boundary surveys, first order / second order vertical and horizontal control <br />surveys, photogrammetric mapping, control surveys and centerline surveys. <br />1QX q1;;1 IH? <br />Central Basin Municipal Water District - 2002 to 2007, as <br />Survey Manager. Work consisted of Construction surveys, <br />topographic surveys, aerial mapping, boundary surveys, legal <br />descriptions and plats. Projects sites were: Central Basin Water <br />Quality Priority Plan, Central Basin Waterline, Raw Water <br />Collector Pipeline, Vernon Booster Pump Station, Hollydale <br />Pump Station and Cal State University Dominguez Hills. Projects <br />were completed on -time and within budget. Reference: Veronica <br />Govea, CBMWD, 62652 Telegraph Rd, Commerce, CA 90040, <br />(323) 201 -5500, veronica awcbwater.org. $45K in Project Fees. <br />City of Los Angeles Department of Public Works, Echo Park <br />Lake Rehabilitation Project - 2008, as Survey Manager. Work <br />consisted of control point survey, aerial photogrammetric <br />mapping, topographic survey of the entire park area, bathymetric <br />survey of the lake bottom, Right -of -Way mapping, locate plume <br />monitoring wells, review Preliminary Title Reports and plot <br />easements, Work performed under Black & Veatch for the City of <br />Los Angeles. $141 K in fees. Reference: Michelle Ma, PE, Black <br />& Veatch Corp, (213) 312 -3348, fax (213) 312 -3399, <br />mamm@bv.com. <br />City of Los Angeles Department of Public Works Penmar <br />Water Quality Improvement Project - 2008, as Survey Manger. <br />Work consisted of a topographic, boundary survey, GPS, digital <br />levels, and ALTA survey. $72K in fees. Reference: Scott <br />Dellinger, PE, Brown & Caldwell, (213) 271 -2300, fax (213) 271- <br />2320, sdellingerna,brwncald.com. <br />COAST SURVEYING, INC. Ruel del Castillo <br />25F -86 <br />