My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (AQMD)
Clerk
>
Contracts / Agreements
>
S
>
SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (AQMD)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2015 2:06:24 PM
Creation date
2/10/2015 9:09:40 AM
Metadata
Fields
Template:
Contracts
Company Name
SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (AQMD)
Contract #
A-2014-306
Agency
FINANCE & MANAGEMENT SERVICES
Council Approval Date
12/2/2014
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract No. ML14012 <br />33. PRE - CONTRACT COSTS - Any costs incurred by CONTRACTOR prior to CONTRACTOR receipt of a fully <br />executed Contract shall be incurred solely at the risk of the CONTRACTOR. In the event that a formal <br />Contract is not executed, neither the MSRC nor the SCAQMD shall be liable for any amounts expended in <br />anticipation of a formal Contract. If a formal Contract does result, pre- contract cost expenditures authorized <br />by the Contract will be reimbursed in accordance with the Payment Schedule and payment provision of the <br />Contract <br />34. CHANGE TERMS - Changes to any part of this Contract must be requested in writing by CONTRACTOR <br />and approved by MSRC in accordance with MSRC policies and procedures. CONTRACTOR must make <br />requests a minimum of 90 days prior to desired effective date of change. All modifications to this Contract <br />shall be in writing and signed by the authorized representatives of the parties. Fueling station location <br />changes shall not be approved under any circumstances. <br />35. PREVAILING WAGES - CONTRACTOR is alerted to the prevailing wage requirements of California Labor <br />Code section 1770 et seq. Notwithstanding the preceding sentence, CONTRACTOR shall be responsible for <br />determining the applicability of the provisions of California Labor Code and complying with the same, <br />including, without limitation, obtaining from the Director of the Department of Industrial Relations the general <br />prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work, making the <br />same available to any interested party upon request, paying any applicable prevailing rates, posting copies <br />thereof at the job site and flowing all applicable prevailing wage rate requirements to its subcontractors. <br />CONTRACTOR shall indemnify, defend and hold harmless the South Coast Air Quality Management District <br />against any and all claims, demands, damages, defense costs or liabilities based on failure to adhere to the <br />above referenced statutes. <br />36. ENTIRE CONTRACT - This Contract represents the entire agreement between CONTRACTOR and <br />SCAQMD. There are no understandings, representations, or warranties of any kind except as expressly set <br />forth herein. No waiver, alteration, or modification of any of the provisions herein shall be binding on any <br />party unless in writing and signed by the authorized representative of the party against whom enforcement of <br />such waiver, alteration, or modification is sought. <br />37. AUTHORITY - The signator hereto represents and warrants that he or she is authorized and empowered and <br />has the legal capacity to execute this Contract and to legally bind CONTRACTOR both in an operational and <br />financial capacity and that the requirements and obligations under this Contract are legally enforceable and <br />binding on CONTRACTOR. <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY LEFT BLANK) <br />
The URL can be used to link to this page
Your browser does not support the video tag.