My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SOUTH COAST LIGHTING - 2014
Clerk
>
Contracts / Agreements
>
S
>
SOUTH COAST LIGHTING - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2015 10:02:14 AM
Creation date
2/11/2015 1:32:29 PM
Metadata
Fields
Template:
Contracts
Company Name
SOUTH COAST LIGHTING
Contract #
A-2014-302
Agency
PUBLIC WORKS
Council Approval Date
12/2/2014
Insurance Exp Date
11/14/2015
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
22. PROTECTION AND RESTORATION OF EXISTING IMPROVEMENTS <br />The Contractor shall be responsible for the protection of all improvements adjacent to the work, such as <br />sprinkler systems, drain pipes, lawns, brick work, plantings, masonry work, fences, wall, sidewalks, street <br />paving, etc., located on either public or private property. If any improvements are damaged they shall be <br />replaced in kind at the Contractor's expense. <br />23. TRAFFIC CONTROL, <br />The Contractor shall conduct all work in a manner that will insure continuous traffic flow on the street at all <br />times. In situations where it is necessary to restrict traffic flow per WATCH, the Contractor will contact the <br />Director for approval. <br />24. MISCELLANEOUS TRAFFIC DEVICES <br />Contractor shall provide all traffic control and miscellaneous traffic devices which may be required for routine <br />and /or extraordinary maintenance pursuant to this Agreement. <br />Signs used for handling traffic during the course of this contract shall be in accordance with the WATCH <br />published by Building News, Inc., and made a part of these special provisions. The method in which signs, <br />barriers and other miscellaneous traffic devices are used during construction and /or repair shall be in <br />accordance with the publication mentioned. A copy of said publication is on file in the Santa Ana Public Works <br />Agency - Construction Engineering Division, <br />All signs shall be illuminated or reflectorized when they are used during hours of darkness. All cones, pylons, <br />barricades, or posts used in the diversion of traffic shall be provided with flashers, or other satisfactory <br />illumination if in place during hours of darkness. All traffic control devices shall be maintained in a like new <br />condition at all times. <br />25. WORK BY CITY FORCES BECAUSE OF NONCONFORMANCE TO CONTRACT <br />Should the Contractor fail to correct deficiencies or public nuisances that have been created because of its operation, <br />then such deficiency or public nuisance will be considered to be of an emergency nature and cause the City to make <br />corrective work. Such work will be done on a force account basis with an additional callout charge of Two Hundred <br />Dollars ($200.00) for each callout. <br />26. APPREN'I'ICESIIIP STANDARDS <br />Where required under law, Contractor shall assume full responsibility for compliance with apprenticeship <br />standards as established by Section 1777.5 of the California State Labor Code. <br />27. SUBCONTRACTORS <br />The Contractor shall not, without the written consent of the City: <br />a. Substitute any person or firm as subcontractor in place of the subcontractor designated in the original <br />proposal. <br />b. Permit any subcontract to be assigned or transferred or allow it to be performed by anyone other than <br />the original subcontractor listed in the proposal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.