Laserfiche WebLink
Bowers Museum Access Compliance Survey Report 1 -1 -1 <br />Facility: Bowers Museum Part: Interior <br />Address: 2002 N Main St, Santa Ana, CA 92706 <br />Floor: Ground Floor <br />ADAAG 4,13.11 <br />• As- Built: 9 lbs ADA 2010 404.2.9 <br />• Proposed Solution: <br />Adjust regular door closer to accessible standards (5 CBC 2010 1133B.2.5 <br />IN max). CBC 2013 11B- 404.2.9 <br />Protrusion Limits <br />191 • As -Built Description: <br />Protruding objects more than 4" from wall, when <br />bottom of object more than 27" or less than 80" <br />above finished floor. <br />• Proposed Solution: <br />Remove /relocate protruding object. Patch existing <br />surface. <br />• Notes: <br />Ensure that BCS is closed when not in use. <br />Accessible u -pull or opening device also <br />required. <br />Si na <br />163 • As -Built Description: <br />Plant within clear floor space of signage. <br />• Proposed Solution: <br />Relocate plant. <br />PCODE EG04 <br />ADAAG 4.4.1 <br />ADA 2010 307.2 <br />CBC 2010 1133B.8.6.1 <br />CBC 2013 11B -307.2 <br />PCODE SA07BNT <br />ADAAG 4,30.6 <br />ADA 2010 703.4.1 <br />CBC 2010 111713.5.7 <br />CBC 2013 I111- 703.4.2 <br />1 JOB <br />1 JOB <br />August 27, 2014 S a l l y Swanson Architects, Inc. P r o j e c i H 14048 Survey Data - Page 29 <br />