Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
ENVIRONMENTAL IMPACT REPORTADDENDUM <br />Bristol Street Widening Phase IIIA— Civic Center Drive to Washington Avenue <br />g.) Place housing within a 100 year flood hazard area as mapped on a federal Flood Hazard <br />Boundary or Flood Insurance Rate Map or other flood hazard delineation map? <br />The proposed widening would not place any housing within a 100 -year flooding zone as mapped by the <br />Federal Emergency Management Agency; therefore, no impact would result from the proposed Project in <br />that regard. Impacts would be similar to those identified in the 1990 FEIS /EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />h.) Place within a 100 year flood hazard area structures which would impede or redirect flood <br />flows? <br />Refer to response in 3.9 (g), above. Impacts would be similar to those identified in the 1990 FEIS /EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />i.) Expose people or structures to a significant risk of loss, injury or death involving flooding, <br />including flooding as a result of the failure of a levee or dam? <br />The proposed Project does not involve the development or placement of any structures, with exception of <br />relocation of utility poles. Therefore, the Project would not expose people or structures to a significant <br />flooding risk beyond that which already exists. No impact would result from the proposed Project. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />j.) Inundation by seiche, tsunami, or mudflow? <br />The Project site is located approximately 10 miles inland from the Pacific Ocean; therefore, the likelihood <br />of tsunami impacting the site is minimal. The Project site and vicinity are highly urbanized and there is no <br />unusual slope or geologic features in the area. The potential for seiche, tsunami, or mudflow impacting <br />the Project site is less than significant. Impacts would be similar to those identified in the 1990 FEIS /EIR. <br />Mitigation Measure <br />No new additional mitigation measures are required. <br />3.10 Land Use and Planning <br />This section corresponds with Section IV - Environmental Consequences and Mitigation Measures, <br />Subsection A - Landform Modification, of the 1990 FEIS /EIR. <br />a.) Physically divide an established community? <br />The proposed Project involves the widening of Bristol Street between Civic Center Drive and Washington <br />Avenue; the proposed widening would not divide an established community. Although the proposed <br />widening of Bristol Street within the Project limits would result in full acquisition of existing properties, <br />ANA 305 -011 (PER 02) CITY OF SANTA ANA (01/19/2015) YU PACE 46 <br />75B -65 <br />