Laserfiche WebLink
ENVIRONMENTAL IMPACT REPORTADDENDUM <br />Bristol Street Widening Phase IIIA- Civic Center Drive to Washington Avenue <br />4.0 REFERENCES <br />The following references were utilized for the preparation of this Addendum. <br />Applied Earthworks, Inc. 2015. Historic Property Survey Report - Bristol Street Widening Project (Phase <br />III) Civic Center Drive to Seventeenth Street. January 2015. <br />Basmaciyan- Darnell, hic. 1985. Intercity Liaison Committee - Five -Year Transportation Study Update to <br />1990. <br />California Department of Transportation (Caltrans). 2012. Noise Study Report - Bristol Street Widening <br />Phase III Civic Center Drive to Seventeenth Street. March 2012. <br />Motile, Grover & Associates. 1983. Bristol Street Corridor Study - Final Report. <br />Parsons, Brinekerhoff, Quade, and Douglas, Inc. 1983. Arterial Highway Element - Santa Ana Element - <br />Santa Ana Transportation Corridor State II Alternative Analysis. <br />POWER Engineers, Inc. 2015. Relocation Impact Statement Technical Memorandum - Bristol Street <br />Widening Project (Phase III) Civic Center Drive to Seventeenth Street. January 2015. <br />RBF Consulting. 2014. Supplemental Technical Noise Study Memorandum - Bristol Street Widening <br />Project (Phase III) Civic Center Drive to Seventeenth Street. August 2014. <br />2015. Phase I Initial Site Assessment Update - Bristol Street Widening Project (Phase III) Civic <br />Center Drive to Seventeenth Street. January 2015. <br />Santa Ana, City of. 2010. City of Santa Ana General Plan. Adopted September 1982 (with updates and <br />reformatting through January 2010). <br />2013. City of Santa Ana Website: www.ci.santa- ana.ca.us. Accessed November 2013. <br />2013b. 17' St. at Bristol St. EB Right Turn Pocket Future LOS Calculation Memorandum. <br />November 25, 2013. <br />Southern California Association of Governments (SCAG). 2008. Orange County RTIP, Project Listing <br />Report. Accessed at: www.scag.ca.gov. <br />URS Corporation. 2010a. Traffic Impact Analysis - Bristol Street Widening Project Phase III Civic <br />Center Drive to Seventeenth Street. September 2010. <br />. 2010b. Community Impact Assessment - Bristol Street Widening Project Civic Center Drive to <br />Seventeenth Street (Phase III). October 2010. <br />2011a. Natural Environment Study (Minimal Impacts) - Bristol Street Widening Project Civic <br />Center Drive to Seventeenth Street (Phase III). April 2011. <br />201 lb. Final Relocation Impact Statement- Bristol Street Widening Project Civic Center Drive to <br />Seventeenth Street (Phase III). November 2011. <br />2012a. Historic Resources Evaluation Report - Bristol Street Widening Project Civic Center Drive <br />to Seventeenth Street (Phase III). September 2012. <br />ANA 305 -011 (PER 02) CITY OF SANTA ANA (01/19/2015) YU PAGE 57 <br />75B -76 <br />