My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - BRISTOL EIR FR CIVIC CENTER TO WASHINGTON(no exhibit 1)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
04/07/2015
>
75B - PH - BRISTOL EIR FR CIVIC CENTER TO WASHINGTON(no exhibit 1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2015 12:32:24 PM
Creation date
4/3/2015 10:54:31 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75B
Date
4/7/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORTADDENDUM <br />Bristol Street Widening Phase IIIB — Washington Avenue to 17" Street <br />MODIFIED INITIAL STUDY CHECKLIST <br />- - <br />New Impacts of Proposed <br />Previous FEIS /EIR <br />Project Changes <br />No <br />Less Than <br />LessThan <br />Potentially <br />Impacts <br />Subsequent or <br />Impact <br />Significant. <br />`Significant <br />Significant <br />Disclosed? <br />Supplemental EIR <br />Impact <br />After <br />Impact <br />Required? <br />Mitigation <br />X <br />YES <br />NO <br />c) Be located on a geologic unit or soil that <br />is unstable, or that would become unstable <br />as a result of the project, and potentially <br />result In on- or off -site landslide, lateral <br />spreading, subsidence, liquefaction or <br />collapse? <br />X <br />YES <br />NO <br />d) Be located on expansive soil, as defined <br />in Table 18 -1 -B of the Uniform Building <br />Code (1994), creating substantial risks to <br />life or property? <br />........_........._............ <br />_.__. °'-----'--..._.._... <br />...._ ..................................... <br />X <br />...... _...._...... _..- ... --. <br />....... .............._......._....... <br />N/A <br />NO <br />e) Have soils incapable of adequately <br />supporting the use of septic tanks or <br />alternative waste water disposal systems <br />where sewers are not available for the <br />disposal of waste water? <br />7. GREENHOUSE GAS EMISSIONS. <br />Would the project <br />a) Generate greenhouse gas emissions, <br />X <br />NO <br />NO <br />either directly or indirectly, that may have a <br />significant impact on the environment? <br />b) Conflict with an applicable plan, policy <br />X <br />NO <br />NO <br />or regulation adopted for the purpose of <br />reducing the emissions of greenhouse <br />gases? <br />8. HAZARDS. Would the project Involve: <br />X <br />YES <br />NO <br />a) Create a significant hazard to the public <br />or the environment through the routine <br />transport, use, or disposal of hazardous <br />materials? <br />X <br />YES <br />NO <br />b) Create a significant hazard to the public <br />or the environment through reasonably <br />foreseeable upset and accident conditions <br />involving the release of hazardous <br />materials into the environment? <br />..................... ............................... <br />X <br />.............. ..................... ..........._............... <br />........ <br />N/A <br />...._ ......... _ ..... ..... .__...------ . <br />NO <br />c) Emit hazardous emissions or handle <br />hazardous or acutely hazardous materials, <br />substances, or waste within one - quarter <br />mile of an existing or proposed school? <br />............._.._............,,...,,,....... <br />,...,..,,..._.....__- <br />X <br />---..__._� <br />........ ............... ............. ... <br />..............,._..._........._ <br />YES <br />._ .._.._.....__._..._._..._.._... <br />NO <br />d) Be located on a site which is included <br />on a list of hazardous materials sites <br />compiled pursuant to Government Code <br />Section 65962.5 and, as a result, would it <br />create a significant hazard to the public or <br />the environment? <br />X <br />N/A <br />NO <br />e Fora project located within an airport <br />ANA 305 -011 (PER 02) CITY OF SANTA ANA (01/19/2015) YU <br />75B -84 <br />
The URL can be used to link to this page
Your browser does not support the video tag.