My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - BRISTOL EIR FR CIVIC CENTER TO WASHINGTON(no exhibit 1)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
04/07/2015
>
75B - PH - BRISTOL EIR FR CIVIC CENTER TO WASHINGTON(no exhibit 1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2015 12:32:24 PM
Creation date
4/3/2015 10:54:31 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75B
Date
4/7/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORTADDENDUM <br />Bristol Street Widening Phase IIIB — Washington Avenue to 17" Street <br />MODIFIED INITIAL STUDY CHECKLIST <br />` <br />New Impacts of Proposed - <br />Previous: FEIS /EIR '. <br />Project Changes <br />No <br />Less.Than' <br />Less Than <br />Potentially <br />Impacts <br />Subsequentor <br />Impact <br />Significant <br />Significant <br />Significant <br />Died ad? <br />Supplemental EIR <br />Impact <br />After <br />Impact <br />Required? <br />Mitigation <br />11. MINERAL RESOURCES. Would the <br />project: <br />a) Result in the loss of availability of a <br />X <br />YES <br />NO <br />known mineral resource that would be of <br />value to the region and the residents of the <br />state? <br />.............................. <br />X <br />............................... <br />_......._..--'............................................................. <br />,.......... ............,...___ <br />YES <br />....... ... _ ............. ..._... <br />NO <br />b) Result in the loss of availability of a <br />locally - important mineral resource <br />recovery site delineated on a local general <br />plan, specific plan or other land use plan? <br />12. NOISE. Would the project result in: <br />a) Exposure of persons to or generation of <br />X <br />YES <br />NO <br />noise levels in excess of standards <br />established in the local general plan or <br />noise ordinance, or applicable standards of <br />other agencies? <br />b) Exposure of persons to or generation of <br />X <br />YES <br />NO <br />excessive groundborne vibration or <br />groundborne noise levels? <br />c) A substantial permanent increase in <br />.......... <br />.. <br />X <br />... .. .......... <br />.. . ..... <br />._._ <br />YES <br />.._-----__.__..._..__...--- <br />NO <br />ambient noise levels in the project vicinity <br />above levels existing without the project? <br />d) A substantial temporary or periodic <br />__ <br />._...... <br />X <br />__...__._..._.. <br />.............. <br />__. _...__ <br />YES <br />..... ..............___ <br />NO <br />increase in ambient noise levels in the <br />project vicinity above levels existing <br />without the project? <br />e) For a project located within an airport <br />X <br />N/A <br />NO <br />land use plan or, where such a plan has <br />not been adopted, within two miles of a <br />public airport or public use airport, would <br />the project expose people residing or <br />working in the project area to excessive <br />noise levels? <br />ANA 305 -011 (PER 02) CITY OF SANTA ANA (01/19/2015) YU <br />75B -87 <br />APPENDIX A <br />
The URL can be used to link to this page
Your browser does not support the video tag.