My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH - DEV AGMT 200 FIRST AMERICAN WAY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
04/21/2015
>
75A - PH - DEV AGMT 200 FIRST AMERICAN WAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2015 5:17:48 PM
Creation date
4/16/2015 5:08:33 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
4/21/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana Chapter2. Protect Description <br />MacArthur Place and MacArthur Boulevard and a water feature at the leasing office located at the <br />corner of MacArthur Place and First American Way, <br />2.5 Description of Changes to the Proposed Project <br />The proposed project consists of developing 284 mild - family residential units, which is unchanged <br />from the project previously analyzed in the 2012 IS /MND. However, the units would be spread <br />among six 5 -story buildings on the full 3.1 -acre site. The maximum height of the buildings would <br />remain 55 feet. The proposed project would also increase the number of parking stalls within the <br />subterranean garage to 630 and provide a total of 72,830 Square feet of recreation and open space. <br />Access to the proposed project's parking garage would be via the driveway shared with the parking <br />structure to the east. The circulation pattern in and out of the shared driveway would still be <br />controlled by a right -in, right -out ingress /egress from Bast First American way. The construction <br />phase would shorten to 12 months and require excavation to a depth of 22 feet, resulting in only <br />approximately 34,000 cubic yards of export soil material. The architectural style of the proposed <br />project would remain the same with a contemporary /modern design and would incorporate <br />concrete, cement boards, decorative panels, wood, and glass elements. <br />Discretionary approvals would Include site plan review, amendment to the Development <br />Agreement, and adoption of the Addendum. <br />Table 2.2 summarizes the features of the proposed project and the differences from The Met <br />IS /MND, and Figures 2 -4 through 2 -7 show the engineeringand architectural plans for the proposed <br />project. <br />Table 2.2. Summary of the Differences between the Proposed Project and The Met IS /MND <br />The Met <br />Feature <br />Development Area 3.1 acres Z.5 acres +0.6 acre <br />Number ofHadldings <br />6 <br />3 <br />+3 <br />Studio Apartments <br />14 <br />- <br />414 <br />One-Bedroom Apartments <br />129 <br />192 <br />-63 <br />Two - Bedroom Apartments <br />136 <br />82 <br />454 <br />Three-Bedromn Apartments <br />5 <br />10 <br />+5 <br />Total Apartments <br />284 <br />284 <br />0 <br />Handicapped Parking Spaces <br />14 <br />10 <br />+4 <br />Tandem Parking Spaces <br />260 <br />330 <br />-70 <br />Full Size Parking Spaces <br />356 <br />285 <br />+71 <br />Total Parking <br />630 <br />625 <br />+5 <br />Total Recreation & Open Space <br />72,830squarefeet <br />56,800squarefeet <br />+16,030squarefeet <br />Total Impervious Surface Area <br />97,121 squarefeet <br />111,017squarefeet <br />- 13,896squarefeet <br />Excavation <br />34,000cubicyards <br />144,895cubicyards <br />- 110,895cubicyards <br />Construction Duration <br />12 months <br />22 months <br />-10 months <br />The Met of SoUth Coast 2-3 March 2015 <br />Addendum <br />75A -74 <br />
The URL can be used to link to this page
Your browser does not support the video tag.