Laserfiche WebLink
• Third patty subsystems may be staged at the manufacturer's facilities and integrated in the field. <br />Customer Responsibilities: <br />• Provide information on existing system interfaces as may be required. <br />• Provide information on room layouts or other information necessary for the assembly to meet <br />field conditions. <br />Completion Criteria: <br />• System staging completed and ready for testing. <br />4.6.5 Perform Staging Acceptance Test Procedures <br />Motorola Responsibilities: <br />• Test and validate system software and features. <br />• Functional testing of standard system features. <br />• Conduct site level testing. <br />• Power -up site equipment and perform standardized functionality tests. <br />• Perform system bum -in 24 hours a day during staging to isolate and capture any defects. <br />Customer Responsibilities: <br />• None. <br />4.6.6 Ship Equipment to Field <br />Motorola Responsibilities: <br />• Pack system for shipment to final destination. <br />• Arrange for shipment to the field. <br />Customer Responsibilities: <br />• None. <br />Completion Criteria: <br />• Equipment ready for shipment to the field. <br />4.6.7 CCSi Ship Acceptance (Milestone) <br />• All equipment shipped to the field. <br />4.7.1 Develop Templates <br />Motorola Responsibilities: <br />• Motorola assists Santa Ana in deftning each console template. Up to four templates will be <br />provided. <br />• Motorola participates in a meeting to finalize any changes among user groups. <br />• Program the approved templates into the consoles. <br />• Program sample radios with approved templates and deliver for Santa Ana evaluation. <br />City of Santa Ana <br />MCC7500 P25 Dispatch Migration and Subscribers <br />02 April 2015 <br />Use or disclosure of this proposal is subject <br />to the restrictions on the cover page. <br />Q Motorola Solutions Confidential Restricted Statement ofWork 4 -i <br />