My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MOTOROLA CREDIT CORPORATION AND MOTOROLA SOLUTIONS -2015
Clerk
>
Contracts / Agreements
>
M
>
MOTOROLA CREDIT CORPORATION AND MOTOROLA SOLUTIONS -2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 2:36:09 PM
Creation date
5/12/2015 4:48:10 PM
Metadata
Fields
Template:
Contracts
Company Name
MOTOROLA CREDIT CORPORATION AND MOTOROLA SOLUTIONS
Contract #
A-2015-083-01
Agency
Police
Council Approval Date
5/5/2015
Notes
related to A-2015-083 and A-2015-082
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.9.6 System Installation Acceptance (Milestone) <br />• All equipment installations are completed and accepted by Santa Ana. <br />4.10.1 Optimize System FNE <br />Motorola Responsibilities: <br />• Motorola and its subcontractors optimize each subsystem. <br />• Verify that all equipment is operating properly and that all electrical and signal levels are set <br />accurately. <br />• Verify that all audio mad data levels are at factory settings. <br />• Check audio and data levels to verify factory settings. <br />• Verify communication interfaces between devices for proper operation. <br />• Test features and functionality are in accordance with manufacturers' specifications and that they <br />comply with the final configuration established during the CDR/system staging. <br />• Set up the consoles on the radio system to perform the dispatching operation. <br />Customer Responsibilities: <br />• Provide access /escort to the sites. <br />• Provide required radio ID and alias information to enable alias database setup for interface to <br />console. <br />• Configure existing logging recorder to accept analog audio inputs. <br />• Dispatchers to use the existing conventional system icons for dispatching until catover. <br />Completion Criteria: <br />• System FNE optimization is complete. <br />4.10.2 Link Verification <br />Motorola Responsibilities: <br />• Perform test to verify site link performance, prior to the interconnection of the Motorola- supplied <br />equipment to the link equipment. <br />Customer Responsibilities: <br />Make available the required links which meet the specifications supplied by Motorola at the <br />CDR. <br />4.10.3 Completion Criteria: <br />• Link verification successfully completed. <br />4.10.4 Optimization Complete <br />• System optimization is completed. Motorola and Santa Ana agree that the equipment is ready for <br />acceptance testing. <br />Clty of Santa Ana <br />NIC07500 P25 Dispatch Migration and Subscribers <br />QMotorola Solutions Confidential Restricted <br />02 April 2015 <br />Use or disclosure of this proposal is subject <br />to the restrictions on the cover page. <br />Statement of Work 4 -11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.