Laserfiche WebLink
4.9.6 System Installation Acceptance (Milestone) <br />• All equipment installations are completed and accepted by Santa Ana. <br />4.10.1 Optimize System FNE <br />Motorola Responsibilities: <br />• Motorola and its subcontractors optimize each subsystem. <br />• Verify that all equipment is operating properly and that all electrical and signal levels are set <br />accurately. <br />• Verify that all audio mad data levels are at factory settings. <br />• Check audio and data levels to verify factory settings. <br />• Verify communication interfaces between devices for proper operation. <br />• Test features and functionality are in accordance with manufacturers' specifications and that they <br />comply with the final configuration established during the CDR/system staging. <br />• Set up the consoles on the radio system to perform the dispatching operation. <br />Customer Responsibilities: <br />• Provide access /escort to the sites. <br />• Provide required radio ID and alias information to enable alias database setup for interface to <br />console. <br />• Configure existing logging recorder to accept analog audio inputs. <br />• Dispatchers to use the existing conventional system icons for dispatching until catover. <br />Completion Criteria: <br />• System FNE optimization is complete. <br />4.10.2 Link Verification <br />Motorola Responsibilities: <br />• Perform test to verify site link performance, prior to the interconnection of the Motorola- supplied <br />equipment to the link equipment. <br />Customer Responsibilities: <br />Make available the required links which meet the specifications supplied by Motorola at the <br />CDR. <br />4.10.3 Completion Criteria: <br />• Link verification successfully completed. <br />4.10.4 Optimization Complete <br />• System optimization is completed. Motorola and Santa Ana agree that the equipment is ready for <br />acceptance testing. <br />Clty of Santa Ana <br />NIC07500 P25 Dispatch Migration and Subscribers <br />QMotorola Solutions Confidential Restricted <br />02 April 2015 <br />Use or disclosure of this proposal is subject <br />to the restrictions on the cover page. <br />Statement of Work 4 -11 <br />