My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25M - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
08/04/2015
>
25M - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2015 10:37:58 AM
Creation date
7/30/2015 5:17:08 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25M
Date
8/4/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Assistance Procedures Manual EXHBIT 10 -K <br />Consultant Certification of Contract Costs and Financial Management System <br />EXHIBIT 10 -K CONSULTANT CERTIFICATION OF CONTRACT COSTS AND FINANCIAL <br />MANAGEMENT SYSTEM <br />(Note: If requesting to utilize the Safe Harbor Indirect Cost Rate submit Attachment I of <br />DLA -0B 13-07- Safe Harbor Indirect Cost Rate for Consultant Contracts found at <br />http: / /www. dot. ca. gov/ hq/ LocalProgramsIDLA_OBIDLA_OB.htm in lieu of this form.) <br />Certification of Final Indirect Costs: <br />Consultant Firm Name: GMU GEOTECHNICAL, INC. <br />Indirect Cost Rate: Safe Harbor Indirect Cost Rate = 110% <br />Date of Proposal Preparation (mm /dd /yyyy): 09/03/2014 <br />Fiscal Period Covered for Indirect Cost Rate Developed: 02/01/2015 to 02/01/2018 <br />Contract Number: Project Number: RFP No. 14 -037 <br />I, the undersigned, certify that I have reviewed the proposal to establish final indirect cost rates for the fiscal <br />period as specified above and to the best of my knowledge and belief: <br />1. All costs included in this proposal to establish final indirect cost rates are allowable in <br />accordance with the cost principles of the Federal Acquisition Regulations (FAR) of Title 48, <br />Code of Federal Regulations (CFR), Part 31. <br />2. This proposal does not include any costs which are expressly unallowable under the cost <br />principles of the FAR of 48 CFR, Part 31. <br />All known material transactions or events that have occurred affecting the firm's ownership, organization, and <br />indirect cost rates have been disclosed as of the date of proposal preparation noted above. <br />Certification of Financial Management System: <br />I, the undersigned, certify to the best of my knowledge and belief that our financial management system meets the <br />standards for financial reporting, accounting records, internal and budget control as set forth in the FAR of Title <br />49, CFR, Part 18.20 to the extent applicable to Consultant. <br />Certification of Dollar Amount for all A &E contracts: <br />I, the undersigned, certify that the approximate dollar amount of all A &E contracts awarded by Caltrans or a <br />California local agency to this firm within the last three (3) calendar years for all State DOT and Local Agencies <br />is $4.5 million and the number of States in which the firm does business is 4. <br />Certification of Direct Costs: <br />I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost <br />proposal(s) in this contract are reasonable, allowable and allocable to the contract in accordance with the cost <br />principles of the FAR of Title 48, CFR, Part 31. Allowable direct costs to a Government contract shall be: <br />Page 1 of 2 <br />25M-135 January 30, 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.