My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25M - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
08/04/2015
>
25M - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2015 10:37:58 AM
Creation date
7/30/2015 5:17:08 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25M
Date
8/4/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V i WILLDAN <br />Celebrating 50 years oa ° set vice <br />February 3, 2015 <br />City of Santa Ana <br />Attn: Monica M. Suter, PE, TE, PTOE <br />Public Works Agency <br />20 Civic Center Plaza, 3`d Floor, Ross Annex <br />Santa Ana, CA 92701 <br />Re: Sealed Proposal for RFP No. 14 -037; On Call Engineering Services in the City of Santa Ana <br />Dear Ms. Suter: <br />Willdan Engineering (Willdan) is pleased to provide requested forms, Exhibit 10 -K and Exhibit <br />10 -H, for us and our subconsultants. We are including fully signed and compliant forms from <br />Willdan Engineering and the following subconsultants: <br />• Absolute Consulting Engineers <br />• Black O'Dowd and Associates, DBE BOA Architecture <br />• Coast Surveying, Inc. <br />• Counts Unlimited, Inc. <br />• WKE, Inc. <br />Willdan has requested for RFP No. 14 -037, Exhibits 10 -K and 10 -H also from the following <br />subconsultant, which is in the process of obtaining compliance with the Federal rate <br />requirements and the above forms; however, has not yet, as their principal is currently out of <br />the office on emergency leave: <br />• OMB Electrical Engineers, Inc. <br />Willdan understands that all information provided to date is available to the public, including <br />the attached forms. By signing this letter, I agree that I am authorized to bind the firm. Willdan <br />further understands that the update that consultant agreements will be fortwo years, with an <br />optional extension of two additional years. <br />Respectfully submitted, <br />WILLDAN ENGINEERING <br />Daniel Chow <br />President and CEO <br />Engineering and Planning I Enemy Efficiency and Sustainability I Financial and Economic Consulting I National Preparedness and Interoperability <br />714.978.8200 fax: 714.978.8299 1 2401 East Kateila Avenue, Suite 450, Anaheim, California 92805 -5982 1 www.willdan.com <br />25M -161 <br />
The URL can be used to link to this page
Your browser does not support the video tag.