Laserfiche WebLink
SoIittian GaeeIIeuce <br />Section VI - Rate and Service Structure <br />Description <br />Amount <br />Section VI 4 a. Board -up cost of 1st standard window, flat rate for materials and on site labor only. <br />$90.00 <br />Section VI (1) Each additional window thereafter, flat rate for materials and on site labor only. <br />$75.00 <br />Section VI 4 b. Board -up cost of 1st single door opening, flat rate for materials and on site labor only. <br />$100.00 <br />Section VI (1) Each additional door thereafter, flat rate for materials and on site labor only. <br />$75.00 <br />Section VI 4 c. Board -up cost of garage doors (assumes a roll up door for a double car garage opening or <br />two single door side by side). Includes 4 sheets of OSB, necessary screws and /or nails, 6 - 2 x 4' and ram <br />sets. This is a flat rate for materials and on site labor only. <br />$210.00 <br />Section VI 4 c. 1. Board -up cost of a garage door (assumes a roll up door for a single car garage opening). <br />Includes 2 sheets of OSB, necessary screws and /or nails, 4 - 2 x 4' and ram sets. This is a flat rate for <br />materials and on site labor only. <br />$115.00 <br />Section VI 4 d. Bolt, screw door, garages and windows, flat rate for materials and on site labor only. <br />$60.00 <br />Section VI 4 e. Chain and lock fee (includes 1 master lock H hardness, 1 %:° shackle, and 3' of 5/16" <br />galvanized chain) Installed, flat rate for materials and on site labor only. <br />$115.00 <br />Section VI 4 f. Travel charges, per hour. <br />$95.00 <br />Sections VI 4 g. After -hour charge, per hour. <br />$120.00 <br />Non - collusion clause <br />The signer of the RFP declares in this writing that the only person, persons, company or parties interested <br />in the proposal as principals are named herein; that this proposal was made without collusion with any <br />other person, persons, company or parities submitting a proposal; that it is in all respects fair and in good <br />faith without collusion or Fraud; and, that the signer of this proposal has full authority to bind the principal <br />proposer. <br />Thank you for the opportunity, <br />t <br />Paul B. Strader <br />CA contractor's license B and C -21 1003099 <br />HA %WOPER certificate #34455 <br />Lead Safety RRP certificate R_I- 19157 - 11.00225 <br />Q(v1.11VI� / I IA 11; 01111 I Al IJ. S. IA 1 I LA i (19 - "al <br />uuuc(6'1 "t lviitnl(,mccruil <br />